Using a hypothetical 3 GW IT build-out in Singapore, this Nortek paper shows how the choice of cooling technology changes national water and electricity demand.
On this page
Overview
The paper starts from Singapore's resource baseline: about 606 million m3/yr of water and about 50 TWh/yr of electricity in 2019, with 2018 peak demand near 7,000 MW. A hypothetical 3 GW IT load is placed against it, comparing water-cooled and air-cooled chiller plants at 24 C supply air with StatePoint Liquid Cooling (SPLC) alone at 32 C SAT and SPLC with chiller trim.
On water, water-cooled chillers need about 1.9 L/kWh WUE and about 51 million m3 a year, while SPLC at 32 C SAT cuts that to about 1.09 L/kWh and 29 million m3. On energy, annualised pPUE at 24 C SAT is about 1.3 for water-cooled and about 1.4 for air-cooled chillers (6.8 and 9.8 TWh/yr), against about 1.12 pPUE and 2.3 TWh/yr for SPLC at 32 C.
As an efficiency measure, chiller COP is typically 3-7, SPLC 12-21 year-round, SPLC with water-cooled trim 8-16 and with air-cooled trim 6-14. At peak, 3 GW of IT on air-cooled chillers draws about 1,147 MW (16% of the national peak) versus about 800 MW water-cooled, and SPLC is far lower. The case study assumes water at about USD 2/m3 and power at about USD 0.10/kWh. The paper also describes SPLC operating modes and the membrane exchanger's water-quality benefits; the scenario is hypothetical and manufacturer-sourced.
Key points
- Singapore: ~606 million m3/yr water, ~50 TWh/yr electricity (2019); 2018 peak demand ~7,000 MW.
- 3 GW IT at 24 C SAT: water-cooled chillers ~1.9 L/kWh WUE and ~51 million m3/yr; SPLC at 32 C SAT ~1.09 L/kWh and ~29 million m3/yr.
- Annualised pPUE at 24 C SAT: water-cooled ~1.3, air-cooled ~1.4 (6.8 and 9.8 TWh/yr); SPLC at 32 C ~1.12 and ~2.3 TWh/yr.
- COP: chillers 3-7; SPLC 12-21; SPLC with water-cooled trim 8-16; with air-cooled trim 6-14.
- Peak power: air-cooled chillers ~1,147 MW (16% of national peak) versus ~800 MW water-cooled.
- Case prices: water ~USD 2/m3, power ~USD 0.10/kWh.
Using it in design
- At the selected supply-air temperature, compare annual water use, WUE and cooling energy for alternative plants using local water and electricity tariffs.
- Flag sites where projected campus water or power use is a material share of local supply.
- Use technology-specific plant COP ranges as documented assumptions in early energy studies.
Who should read it
Planners and sustainability leads choosing a large-campus site and cooling technology.
Related standards
- ISO/IEC 30134-9
- ASHRAE TC 9.9 Thermal Guidelines
Publication details
- Authors
- Philip LePoudre
- Publisher
- Nortek Air Solutions
- Year
- 2021
- Document number
- 597f
- Document language
- English
- Source type
- Manufacturer
- Access
- Free to read
- Licence
- Copyright retained; citation only: the publisher’s terms apply to the original document