Technical guideFree to read2021

Solutions to Water and Power Availability that Challenge the Future of Data Centers

Nortek Air Solutions · Philip LePoudre

Using a hypothetical 3 GW IT build-out in Singapore, this Nortek paper shows how the choice of cooling technology changes national water and electricity demand.

On this page

Overview

The paper starts from Singapore's resource baseline: about 606 million m3/yr of water and about 50 TWh/yr of electricity in 2019, with 2018 peak demand near 7,000 MW. A hypothetical 3 GW IT load is placed against it, comparing water-cooled and air-cooled chiller plants at 24 C supply air with StatePoint Liquid Cooling (SPLC) alone at 32 C SAT and SPLC with chiller trim.

On water, water-cooled chillers need about 1.9 L/kWh WUE and about 51 million m3 a year, while SPLC at 32 C SAT cuts that to about 1.09 L/kWh and 29 million m3. On energy, annualised pPUE at 24 C SAT is about 1.3 for water-cooled and about 1.4 for air-cooled chillers (6.8 and 9.8 TWh/yr), against about 1.12 pPUE and 2.3 TWh/yr for SPLC at 32 C.

As an efficiency measure, chiller COP is typically 3-7, SPLC 12-21 year-round, SPLC with water-cooled trim 8-16 and with air-cooled trim 6-14. At peak, 3 GW of IT on air-cooled chillers draws about 1,147 MW (16% of the national peak) versus about 800 MW water-cooled, and SPLC is far lower. The case study assumes water at about USD 2/m3 and power at about USD 0.10/kWh. The paper also describes SPLC operating modes and the membrane exchanger's water-quality benefits; the scenario is hypothetical and manufacturer-sourced.

Key points

  1. Singapore: ~606 million m3/yr water, ~50 TWh/yr electricity (2019); 2018 peak demand ~7,000 MW.
  2. 3 GW IT at 24 C SAT: water-cooled chillers ~1.9 L/kWh WUE and ~51 million m3/yr; SPLC at 32 C SAT ~1.09 L/kWh and ~29 million m3/yr.
  3. Annualised pPUE at 24 C SAT: water-cooled ~1.3, air-cooled ~1.4 (6.8 and 9.8 TWh/yr); SPLC at 32 C ~1.12 and ~2.3 TWh/yr.
  4. COP: chillers 3-7; SPLC 12-21; SPLC with water-cooled trim 8-16; with air-cooled trim 6-14.
  5. Peak power: air-cooled chillers ~1,147 MW (16% of national peak) versus ~800 MW water-cooled.
  6. Case prices: water ~USD 2/m3, power ~USD 0.10/kWh.

Using it in design

  • At the selected supply-air temperature, compare annual water use, WUE and cooling energy for alternative plants using local water and electricity tariffs.
  • Flag sites where projected campus water or power use is a material share of local supply.
  • Use technology-specific plant COP ranges as documented assumptions in early energy studies.

Who should read it

Planners and sustainability leads choosing a large-campus site and cooling technology.

Related standards

  • ISO/IEC 30134-9
  • ASHRAE TC 9.9 Thermal Guidelines

Publication details

Authors
Philip LePoudre
Publisher
Nortek Air Solutions
Year
2021
Document number
597f
Document language
English
Source type
Manufacturer
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document

Citation

Philip LePoudre (2021). Solutions to Water and Power Availability that Challenge the Future of Data Centers. Nortek Air Solutions. 597f. https://www.nortekdatacenter.com/wp-content/uploads/2021/04/597f-StatePoint-Solutions-to-Water-and-Power-Availability.pdf

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Cooling capacity in SoSo CAD

Check zone heat loads, installed capacity and the capacity left with the largest unit out, as part of the design.

Zone heat loads and capacity balance in the SoSo CAD cooling workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.