Technical guideFree to read2024

Open Rack V3 Blind Mate Manifold Specification, Rev 1.0

Original title Open Rack V3 Blind Mate Manifold Specification, Revision 1.0 (April 2024)

Open Compute Project Foundation · Tom Breda (Parker), Glenn Charest (Meta) et al.

OCP's 5 April 2024 ORv3 specification defines interfaces of the rear-of-rack blind mate liquid cooling manifold: 50 psig maximum working pressure, 60 °C maximum fluid, branch flow variation of 5% or less targeted.

On this page

Overview

The specification defines fundamental requirements and interfaces for the blind mate manifold used in the Open Compute Project V3 rack; it is a base specification for developing manifold designs rather than a particular implementation. Authors come from Parker, Meta and nVent. Manifolds sit at the rear of the rack and distribute coolant from the remote pumping unit (RPU) or facility supply to the IT gear; service staff no longer connect valves and hoses by hand when installing IT gear, which shortens service time.

Technical chapters cover manifold dimensions and tolerances, internal cross-section, datums, blind mate quick connector (BMQC) interfaces (ISO 11926 thread requirements), rack attachment, thermal performance, structural deflection, hose attachment and routing, materials, safety and environmental compliance. In thermal performance, flow distribution of 5% or less between all branches is strongly recommended in analysis assuming uniform branch impedance; measured variation on the reference design in real testing was 10%. Minimum branch pressure drop is on the order of 1-2 psi for manifolds with a large flow section.

Maximum working pressure is 50 psig. Most tests used Dowfrost LC25 (25% propylene glycol-water) and some pressure tests used water; use with treated water needs additional analysis and testing. The solution is developed for a maximum working fluid temperature of 60 °C. Wetted materials include stainless steel 303, 304/304L, 316/316L for the manifold tube and end brackets; hose materials are not defined in the specification.

Key points

  1. Dated 5 April 2024, Revision 1.0; authors from Parker, Meta and nVent.
  2. The manifold sits at the rack rear and distributes coolant from an RPU or facility supply to IT gear.
  3. Maximum working pressure is 50 psig.
  4. The design is for a maximum working fluid temperature of 60 °C.
  5. Flow variation between branches of 5% or less is recommended in analysis; 10% was measured on the reference design.
  6. Minimum branch pressure drop is on the order of 1-2 psi for large-section manifolds.
  7. Test fluid was 25% propylene glycol-water (Dowfrost LC25); treated water needs additional testing.
  8. Wetted material: manifold tube and brackets in stainless steel 303, 304/304L, 316/316L.
  9. Hose materials are not defined in the specification.

Using it in design

  • Set a 5% branch flow distribution design target when specifying a rack manifold and allow for up to 10% deviation in real testing.
  • Determine the minimum branch pressure drop by calculation and verify it by test.
  • Write 50 psig maximum working pressure and 60 °C fluid temperature into the manifold and coupling specification.
  • If treated water will be used, plan component compatibility analysis and testing separately.
  • Fix supply (right manifold) and return (left manifold) orientation as seen from the rack rear.

Who should read it

Engineers designing OCP ORv3 liquid-cooled racks and manufacturers of manifolds and quick connectors, plus facility designers.

Document contents

  1. License
  2. OCP tenets compliance
  3. Scope
  4. Overview
  5. Open Rack compatibility
  6. Definitions
  7. System orientation reference
  8. Basic manifold requirements and considerations
  9. Mechanical specifications
  10. Mechanical interfaces
  11. Mechanical attachment, manifold to rack
  12. Thermal performance requirements
  13. Structural requirements
  14. Hose attachment and routing
  15. Maximum working pressure rating
  16. Fluid information
  17. Materials and finish
  18. Safety and environmental compliance
  19. Environmental requirements

Related standards

  • OCP ORv3 BMQC
  • OCP Open Rack V3
  • OCP Rack Manifold Requirements white paper

Publication details

Authors
Tom Breda (Parker); Glenn Charest (Meta); Darryl Daniel (Meta); John Fernandes (Meta); Ben Kim (Meta); Grace Piette (Meta); Scott Stammer (nVent); Fabrice Tarissan (Parker)
Publisher
Open Compute Project Foundation
Year
2024
Document number
Rev 1.0
Document language
English
Source type
Industry body
Access
Free to read
Licence
OWFa 1.0: Open Compute open specification licence; redistribution permitted
Original licence note

Section 1: contributions under OWF CLA 1.0, usage under OWFa 1.0 Specification License. Round 1 ingestion retains bibliographic metadata only; no local full text is redistributed.

Citation

Tom Breda (Parker); Glenn Charest (Meta); Darryl Daniel (Meta); John Fernandes (Meta); Ben Kim (Meta); Grace Piette (Meta); Scott Stammer (nVent); Fabrice Tarissan (Parker) (2024). Open Rack V3 Blind Mate Manifold Specification, Revision 1.0 (April 2024). Open Compute Project Foundation. Rev 1.0. https://www.opencompute.org/documents/open-rack-v3-blind-mate-manifold-specification-rev-1-0-review-april05-2024-pdf/

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Cooling capacity in SoSo CAD

Check zone heat loads, installed capacity and the capacity left with the largest unit out, as part of the design.

Zone heat loads and capacity balance in the SoSo CAD cooling workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.