OCP Ready v1 Data Center Site Assessment, v1.0 rev1.5 (example assessment: QScale Q01)
Open Compute Project Foundation · QScale (self-assessment), Open Compute Project OCP Ready programme
A completed OCP Ready v1 self-assessment for QScale Q01 (Lévis, Canada): 28 MW IT, 2N feeds, design PUE below 1.2 and support for 400 kW+ liquid-cooled racks meet the OCP requirements.
On this page
Overview
The document is version 1.0 rev1.5 of the Open Compute Project Foundation's OCP Ready v1 site assessment template for multi-tenant (colocation) sites, shown through a completed self-assessment of the QScale Q01 facility. The site is in Lévis, Quebec, Canada; its status is marked complete and meeting requirements, with a re-assessment date of August 2026.
The template lists measurable attributes under five headings: access (loading dock, delivery pathway, lifts), IT technical space (floor loads, ceiling height), electrical, cooling and cabling. Each attribute is rated Optimum, Acceptable or not met, and a site needs at least Acceptable on every required attribute. Information-only sections cover service, efficiency and openness.
Reported values for Q01: 28 MW IT commissioned in phases 3 and 4, 142 MW secured on the campus, and an owned 266 MVA 2N 120 kV substation. The cold climate allows free cooling for up to 80% of the year, waste-heat recovery is available and design PUE is below 1.2. The site uses no water for cooling (dry coolers only).
The document is a conformance checklist, not a design standard: it proves a site can host OCP hardware. Because of contractual restrictions the actual PUE is not published but is available on request. For a designer it shows what threshold and what evidence each parameter needs.
Key points
- Delivery path thresholds: loading dock to goods-in at least 2.75 m high x 2.4 m wide; goods-in to white space at least 2.4 m x 1.8 m, threshold free.
- Floor loads: corridor rolling load at least 680 kg; unboxing and storage area 1,221 kg/m² (250 lb/ft²) uniform; IT space clear height at least 4.5 m.
- Lift requirement: at least 1,500 kg capacity, 2.4 m door height, 1.5 m width and 1.5 m cabin depth.
- Electrical: 2N (A+B) independent circuits to the rack, 3-phase 32 A/230 V, nominal 400/230 VAC, 47-63 Hz, generator load acceptance under 60 seconds, rack batteries allowed.
- Cooling: front-to-back airflow, maximum rack density at least 12 kW (far higher with liquid and RDHx; the site reports 400 kW+), temperature rise at least 12 K, mandatory blanking of open rack space.
- Inlet air at ASHRAE Class A1 allowable; outside air filtered with MERV-A8 pre-filters and MERV-A13 final filters.
- Cabling: top-fed, three overhead tray levels (intra-pod, inter-pod, out-of-band), OS2 and OM4 fibre, LC duplex and MPO.
- Efficiency: continuous PUE, WUE and CUE monitoring; design and achieved annualised PUE below 1.2; operations to the OCP Critical Facility Operations Guidelines.
Using it in design
- For sites hosting OCP hardware, check delivery path, lift and floor-load thresholds against this list; 1,221 kg/m² and a 4.5 m ceiling exceed many enterprise halls.
- Document 2N A+B rack feeds, 32 A three-phase circuits and generator load acceptance time as provable parameters in the single-line drawings.
- Define rack density zones from the 12 kW baseline up to high-density liquid modules and state airflow and temperature-rise requirements for each zone.
- Include the dry-cooler and free-cooling share with PUE/WUE/CUE metering points in the design file.
Who should read it
Colocation designers, tenant engineers and site owners who want to host OCP hardware.
Document contents
- Site description and status
- 1.0 Access
- 1.1 Ramps
- 1.2 Lifts / elevators
- 2.0 IT technical space (white space)
- 2.1 Electrical
- 2.2 Cooling
- 2.3 Cabling
- 3.0 Service
- 4.0 Efficiency
- 5.0 Openness
Related standards
- OCP Ready programme
- OCP Colocation Facility Guidelines
- IEC 60309
Publication details
- Authors
- QScale (self-assessment); Open Compute Project OCP Ready programme
- Publisher
- Open Compute Project Foundation
- Year
- 2026
- Document number
- v1.0 rev1.5
- Document language
- English
- Source type
- Industry body
- Access
- Free to read
- Licence
- Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note
Published OCP Ready site assessment; no licence statement in the document.
Citation
QScale (self-assessment); Open Compute Project OCP Ready programme (2026). OCP Ready v1 Data Center Site Assessment, v1.0 rev1.5 (example assessment: QScale Q01). Open Compute Project Foundation. v1.0 rev1.5. https://www.opencompute.org/wp-content/uploads/2026/10/OCP-Ready-v1-Site-Assessment-v1.0-rev1.5-QScale-Q01.pdf
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.