Technical guideFree to read2026

OCP Ready v1 Data Center Site Assessment, v1.0 rev1.5 (example assessment: QScale Q01)

Open Compute Project Foundation · QScale (self-assessment), Open Compute Project OCP Ready programme

A completed OCP Ready v1 self-assessment for QScale Q01 (Lévis, Canada): 28 MW IT, 2N feeds, design PUE below 1.2 and support for 400 kW+ liquid-cooled racks meet the OCP requirements.

On this page

Overview

The document is version 1.0 rev1.5 of the Open Compute Project Foundation's OCP Ready v1 site assessment template for multi-tenant (colocation) sites, shown through a completed self-assessment of the QScale Q01 facility. The site is in Lévis, Quebec, Canada; its status is marked complete and meeting requirements, with a re-assessment date of August 2026.

The template lists measurable attributes under five headings: access (loading dock, delivery pathway, lifts), IT technical space (floor loads, ceiling height), electrical, cooling and cabling. Each attribute is rated Optimum, Acceptable or not met, and a site needs at least Acceptable on every required attribute. Information-only sections cover service, efficiency and openness.

Reported values for Q01: 28 MW IT commissioned in phases 3 and 4, 142 MW secured on the campus, and an owned 266 MVA 2N 120 kV substation. The cold climate allows free cooling for up to 80% of the year, waste-heat recovery is available and design PUE is below 1.2. The site uses no water for cooling (dry coolers only).

The document is a conformance checklist, not a design standard: it proves a site can host OCP hardware. Because of contractual restrictions the actual PUE is not published but is available on request. For a designer it shows what threshold and what evidence each parameter needs.

Key points

  1. Delivery path thresholds: loading dock to goods-in at least 2.75 m high x 2.4 m wide; goods-in to white space at least 2.4 m x 1.8 m, threshold free.
  2. Floor loads: corridor rolling load at least 680 kg; unboxing and storage area 1,221 kg/m² (250 lb/ft²) uniform; IT space clear height at least 4.5 m.
  3. Lift requirement: at least 1,500 kg capacity, 2.4 m door height, 1.5 m width and 1.5 m cabin depth.
  4. Electrical: 2N (A+B) independent circuits to the rack, 3-phase 32 A/230 V, nominal 400/230 VAC, 47-63 Hz, generator load acceptance under 60 seconds, rack batteries allowed.
  5. Cooling: front-to-back airflow, maximum rack density at least 12 kW (far higher with liquid and RDHx; the site reports 400 kW+), temperature rise at least 12 K, mandatory blanking of open rack space.
  6. Inlet air at ASHRAE Class A1 allowable; outside air filtered with MERV-A8 pre-filters and MERV-A13 final filters.
  7. Cabling: top-fed, three overhead tray levels (intra-pod, inter-pod, out-of-band), OS2 and OM4 fibre, LC duplex and MPO.
  8. Efficiency: continuous PUE, WUE and CUE monitoring; design and achieved annualised PUE below 1.2; operations to the OCP Critical Facility Operations Guidelines.

Using it in design

  • For sites hosting OCP hardware, check delivery path, lift and floor-load thresholds against this list; 1,221 kg/m² and a 4.5 m ceiling exceed many enterprise halls.
  • Document 2N A+B rack feeds, 32 A three-phase circuits and generator load acceptance time as provable parameters in the single-line drawings.
  • Define rack density zones from the 12 kW baseline up to high-density liquid modules and state airflow and temperature-rise requirements for each zone.
  • Include the dry-cooler and free-cooling share with PUE/WUE/CUE metering points in the design file.

Who should read it

Colocation designers, tenant engineers and site owners who want to host OCP hardware.

Document contents

  1. Site description and status
  2. 1.0 Access
  3. 1.1 Ramps
  4. 1.2 Lifts / elevators
  5. 2.0 IT technical space (white space)
  6. 2.1 Electrical
  7. 2.2 Cooling
  8. 2.3 Cabling
  9. 3.0 Service
  10. 4.0 Efficiency
  11. 5.0 Openness

Related standards

  • OCP Ready programme
  • OCP Colocation Facility Guidelines
  • IEC 60309

Publication details

Authors
QScale (self-assessment); Open Compute Project OCP Ready programme
Publisher
Open Compute Project Foundation
Year
2026
Document number
v1.0 rev1.5
Document language
English
Source type
Industry body
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

Published OCP Ready site assessment; no licence statement in the document.

Citation

QScale (self-assessment); Open Compute Project OCP Ready programme (2026). OCP Ready v1 Data Center Site Assessment, v1.0 rev1.5 (example assessment: QScale Q01). Open Compute Project Foundation. v1.0 rev1.5. https://www.opencompute.org/wp-content/uploads/2026/10/OCP-Ready-v1-Site-Assessment-v1.0-rev1.5-QScale-Q01.pdf

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Power design in SoSo CAD

Calculate supply paths, equipment loads and UPS failure scenarios as part of the design.

Single-line diagram in the SoSo CAD power and capacity workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.