OCP Ready v2 for Hyperscale Data Center Site Assessment, v1.0 rev1.15 (example assessment: Aligned Data Centers PHX04)
Open Compute Project Foundation · Aligned Data Centers (self-assessment), Open Compute Project OCP Ready programme
A completed OCP Ready v2 hyperscale self-assessment for Aligned PHX04 (Chandler, USA): 50.7 MW critical IT, Tier 3-class power and cooling, and design PUE below 1.3 at 80% utilisation.
On this page
Overview
The document is version 1.0 rev1.15 of the Open Compute Project Foundation's OCP Ready v2 site assessment template for hyperscale tenants, illustrated with the self-assessment of Aligned Data Centers' PHX04 facility in Chandler, Arizona. The site is a fully leased wholesale data centre; status is meets requirements, with the original assessment on 29 August 2024 and re-assessment on 26 August 2026.
The v2 template is broader than v1: campus access and logistics (truck circulation, perimeter security), IT technical space (structure, electrical, cooling), meet-me rooms and outside-plant fibre, operations and spares, efficiency, openness and certifications. On security it expects more than 3 access layers, a 24/7 staffed checkpoint and a perimeter fence of at least 2.43 m.
Values reported for PHX04: 160,500 sq ft of white space, 50.7 MW of critical IT power, a block-redundant 6+1 generator and UPS system with static transfer switches, N+N feeds to PDUs, and 12+2 chiller redundancy with thermal energy storage and dual-powered cooling arrays. Power and cooling are rated class 3 (BICSI F3 or Uptime Tier 3 equivalent) with Uptime certification in process.
On efficiency the design PUE at full load is below 1.3 at 80% maximum utilisation; the site has operated for under a year, so annualised PUE is not yet reported. The cooling design needs no water, so WUE monitoring is not applicable. The document is a checklist rather than a standard, showing the evidence behind each requirement.
Key points
- Delivery path: storage and IT space access at least 2.75 m high x 1.6 m wide; floor loads 680 kg rolling and 1,221 kg/m² uniform on slab on grade; IT space clear height at least 4.5 m.
- Freight lift at least 3,000 kg and 2.75 m door height; a 1.5 m cabin depth is rated Acceptable.
- Security: perimeter fence of at least 2.43 m with intrusion detection, backed-up lighting, 24/7 checkpoint, more than 3 access levels, video archive over 30 days (90 days targeted).
- Electrical: 2N (A+B) feeds to the row, 47-63 Hz, overhead busbar, N+N UPS feed; generator load acceptance under 35 seconds rated Acceptable.
- Cooling: 12+2 chiller redundancy, thermal energy storage, front-to-back airflow, maximum rack density at least 12 kW, MERV 8 filters on outside air.
- Network: 3 diverse outside-plant entrances, N+N isolated meet-me rooms, each with two diverse pathways and conduits of at least 100 mm.
- Efficiency: design PUE below 1.3 at 80% utilisation; PUE and WUE tracked monthly with billing calculations, live monitoring being developed.
- Certifications: 3 Green Globes achieved, Uptime certification in process; operations aligned with the OCP Critical Facility Operations Guidelines.
Using it in design
- Carry the delivery path, lift and floor-load table into the project brief for hyperscale tenants.
- Show power and cooling redundancy (for example 6+1 blocks and 12+2 chillers) against the class 3 requirement and prove generator load acceptance time.
- Verify three diverse entrances, N+N isolated meet-me rooms and dual pathways on the layout plan.
- State the utilisation point (here 80%) and the method behind any declared PUE.
Who should read it
Wholesale data-centre designers and tenant engineers working with hyperscale customers.
Document contents
- Campus site access and logistics
- Access controls and monitoring
- Ramps and freight lifts
- IT technical space: structural, electrical, cooling
- Access providers and outside plant fibre
- Meet-me rooms
- Operations and spare parts
- Efficiency
- Openness
- Certifications
Related standards
- OCP Ready programme
- BICSI 002
- OCP Colocation Facility Guidelines
Publication details
- Authors
- Aligned Data Centers (self-assessment); Open Compute Project OCP Ready programme
- Publisher
- Open Compute Project Foundation
- Year
- 2026
- Document number
- v1.0 rev1.15
- Document language
- English
- Source type
- Industry body
- Access
- Free to read
- Licence
- Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note
Published OCP Ready site assessment; no licence statement in the document.
Citation
Aligned Data Centers (self-assessment); Open Compute Project OCP Ready programme (2026). OCP Ready v2 for Hyperscale Data Center Site Assessment, v1.0 rev1.15 (example assessment: Aligned Data Centers PHX04). Open Compute Project Foundation. v1.0 rev1.15. https://www.opencompute.org/wp-content/uploads/2026/10/OCP-Ready-v2-for-Hyperscale-Data-Center-Site-Assessment-v1.0-rev1.15-Aligned-Data-Centers-PHX04.pdf