Huawei AI Data Center Reference Design
Huawei Digital Power
A catalogue of 21 reference designs for AI data centres in two construction forms: fully prefabricated modules (RD 01-14) and steel-structure halls (RD 15-21). Each comes in 50, 70 and 132 kW/rack variants.
On this page
Overview
Every design lists module count and kW, liquid-cooled and network rack counts, ride-through time, and transformer, generator, UPS power module, fan-wall and TMU/CDU quantities with redundancy, plus cooling-tower or air-cooled chiller sizing. The prefab solution covers 1.74-7.15 MW of IT and claims construction cut from 18 to 6 months. Power distribution supports 2N, distributed redundant (DR) and block redundant (BR) architectures.
Numeric examples make the designs concrete. The 50 kW/rack prefab module is 872 kW per module with 16 liquid-cooled racks plus 6 network racks at 12 kW, and 10 min of IT and cooling backup. The RD 01 plant has 3 x 1.8 MW power modules, 3 x 2000 kVA transformers, 3 x 2000 kW DCC generators, fan walls of 210 kW each (4+1) and TMU 360 kW (2+1) x 2. The 132 kW/rack module is 1176 kW with 8 liquid racks; steel-structure halls use air:liquid ratios of 2:8 or 3:7 (range 1:9-3:7).
Equipment conditions are in the datasheets at the end. The TMU/CDU rated condition is primary 37/45 C water and secondary 40/50 C deionised water, with a primary inlet range of 10-50 C and secondary supply of 20-60 C. The SmartLi example gives 300 kW for 10 min or 200 kW for 15 min, operating at 0-40 C with 20-25 C recommended. The fan wall nominal condition is 36 C return air and 20/28 C water.
Key points
- Prefab solution covers 1.74-7.15 MW IT and claims construction cut from 18 to 6 months.
- 50 kW/rack module: 872 kW per module, 16 liquid-cooled racks plus 6 network racks at 12 kW; 10 min IT/cooling backup.
- RD 01: 3 x 1.8 MW power modules, 3 x 2000 kVA transformers, 3 x 2000 kW DCC generators, fan walls 210 kW (4+1), TMU 360 kW (2+1) x 2.
- Power distribution supports 2N, DR and BR architectures.
- 132 kW/rack module: 1176 kW with 8 liquid racks; steel halls use air:liquid 2:8 or 3:7 (range 1:9-3:7).
- TMU/CDU rating: primary 37/45 C, secondary 40/50 C deionised water; primary inlet 10-50 C, secondary supply 20-60 C.
- SmartLi: 300 kW for 10 min or 200 kW for 15 min; operating 0-40 C, 20-25 C recommended.
- Fan wall nominal condition: 36 C return air, 20/28 C water.
Using it in design
- Compare RD 01–21 AI hall designs by rack kW, racks per module, module kW, fan-wall/TMU/tower redundancy, and generator and transformer counts. Use the published designs to cross-check capacity calculations.
- Add an architecture classification {2N, DR, BR} and an air:liquid ratio per hall.
- Check secondary-loop temperatures against CDU limits.
- Default UPS/battery autonomy to 10 min for AI IT and cooling.
Who should read it
Designers choosing between prefabricated and steel-structure AI-hall architectures, and teams that need reference cases to validate capacity calculations.
Related standards
- IEC 62040-3
- TIA-942
- Uptime Tier
Publication details
- Authors
- Huawei Digital Power
- Publisher
- Huawei Digital Power
- Year
- 2025
- Document language
- English
- Source type
- Manufacturer
- Access
- Free to read
- Licence
- Copyright retained; citation only: the publisher’s terms apply to the original document
Citation
Huawei Digital Power (2025). Huawei AI Data Center Reference Design. Huawei Digital Power. https://digitalpower.huawei.com/admin/asset/v1/pro/view/ebce6552984743528e3d148e2449e6a9.pdf
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.