A September 2009 Panduit white paper on its passive Vertical Exhaust System (VES) that ducts hot exhaust to the ceiling return plenum, showing 25% lower cooling operating cost and 0.3-year payback in a 68-cabinet example.
On this page
Overview
This 2009 paper states that raised-floor systems with ceiling returns can typically remove about 7 to 8 kW per cabinet with good practice (24 to 36 in floor, hot/cold aisle layout, suitably sized perforated tiles, proper return path, grommets and blanking panels). Consolidation and virtualization push cabinets to 8 to 12 kW, and blade servers beyond 25 kW, multiplying risks of downtime, lower MTBF, maintenance cost and overcooling.
The VES is a passive exhaust containment system that channels server exhaust through a vertical duct (chimney) directly into the ceiling return plenum, preventing hot air recirculation to equipment inlets. Separating hot and cool air allows a higher supply set point and a larger temperature difference across cooling coils, lowers CRAH fan speed and keeps cabinet inlet within the ASHRAE recommended limit. In its comparison table, passive systems add no operational cost or point of failure, whereas in-cabinet fans, overhead units, rear door exchangers and added CRAH capacity all do.
In the example, a 3,000 ft² room with 68 cabinets needs 6 CRAH units for 8 kW per cabinet. To reach 10 kW per cabinet, option 1 adds 2 CRAH units at $35,000 each (8 CRAH, $280,000, $72,184 a year to operate); option 2 uses 6 CRAH and 37 VES ($235,900, $54,138 a year). Savings are $44,100 in capital (16%) and $18,046 a year in operation (25%), with 0.3-year payback and 266% 10-year ROI (at $0.11/kWh).
Design considerations: keep data cable pathways at the front of the cabinet to leave the rear open for the duct, integrate with fire detection and suppression and lighting, seal the duct at the ceiling plenum and cabinet transitions, use blanking panels and seal cable pass-throughs, hold the ceiling return plenum slightly below room pressure, and above all keep the space behind servers free to avoid back pressure. In a 24 in cabinet cable management arms extend about 4 in into the exhaust area, cutting its effective size by 33%; a 32 in cabinet adds 8 in.
Key points
- Raised floor with ceiling returns removes about 7 to 8 kW per cabinet with best practice.
- Consolidated servers reach 8 to 12 kW per cabinet, and blade configurations can exceed 25 kW.
- VES is a passive system ducting hot exhaust to the ceiling return plenum with no added operating cost or point of failure.
- Example (3,000 ft², 68 cabinets, growth to 10 kW per cabinet): 2 extra CRAH option costs $280,000 and $72,184 a year; 37 VES option costs $235,900 and $54,138 a year.
- Savings: $44,100 capital (16%), $18,046 a year operating (25%); payback 0.3 years, 10-year ROI 266% ($0.11/kWh).
- A CRAH unit at maximum capacity costs about $9,000 a year to run; unit cost is $35,000.
- Cable management arms reduce exhaust area in a 24 in cabinet by about 33%; a 32 in cabinet adds 8 in.
- A ceiling return plenum slightly below room pressure helps draw exhaust into the plenum.
Using it in design
- When cabinet density will exceed 8 kW, compare added CRAH capacity with passive exhaust containment on capital and operating cost side by side.
- If using the vertical duct, route data cable pathways at the cabinet front and leave the rear open.
- Plan space behind servers and cable management so they do not narrow the exhaust area (horizontal cable arms, cabinet width).
- Seal duct transitions at the ceiling plenum and cabinet, cable entries at cabinet tops, blanking panels and cable pass-throughs.
- On retrofits check VES layout against existing lighting and fire suppression design.
Who should read it
Designers evaluating passive exhaust containment for high-density cabinets in raised-floor rooms with ceiling returns.
Document contents
- Introduction
- Reaching the Limits of Traditional Cooling Systems
- Innovative, Cost-Effective Improvements in Data Center Cooling
- VES Design Considerations
- Optimize Room-Level Layout
- Keep the Exhaust Area Open
Related standards
- TIA-942
- ASHRAE TC 9.9 thermal guidelines
Publication details
- Authors
- Panduit Corp.
- Publisher
- Panduit
- Year
- 2009
- Document number
- WP-09
- Document language
- English
- Source type
- Manufacturer
- Access
- Free to read
- Licence
- Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note
©2009 PANDUIT Corp. All rights reserved; copy hosted by distributor (Sonepar)
Citation
Panduit Corp. (2009). UPI Strategies for Smart Data Centers: Deploying a Vertical Exhaust System to Achieve Energy Efficiency and Support Sustainability Goals. Panduit. WP-09. https://res.cloudinary.com/sonepar-fr/raw/upload/s--BAVEy25G--/v1/documents/156/68388481.pdf
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.