Managing AI Data Center Loads with Hybrid Power and Grid Forming Inverters
Rehlko · Justin Lenoff (Rehlko)
A July 2026 white paper from Rehlko (Clarke Energy) describing the control layers for managing fast AI-load swings with an engine-generator and battery energy storage (BESS) hybrid led by a grid-forming inverter.
On this page
Overview
The white paper argues that the large, rapid load swings of AI data centres call for a hybrid power architecture. The engine-generator acts as the muscle, delivering steady-state power, while the BESS acts as the reflexes, providing sub-second stabilization. Because projects usually combine technologies from several vendors, integration between the BESS inverter and the power systems is named as the primary challenge. The glossary defines an AI load as a highly volatile demand profile that can show synchronized swings exceeding 50% to 100% of baseline within seconds.
The paper gives inverter-led control guidance and separates three control layers by timescale. The inverter holds AC-bus voltage and frequency within a sub-cycle (20 ms at 50 Hz, 16.7 ms at 60 Hz). The power management system (PMS) or plant controller (PPC) coordinates real and reactive power dispatch from 16 ms to 1000 ms. The energy management system (EMS) handles scheduling and economic dispatch from 1 second to 24 hours and beyond. Engines have mechanical and governor-based ramps of several hundred milliseconds to seconds and are not designed to react to transient AI load spikes.
A simple battery-sizing method is given: treat the load curve as rapid fluctuations around the steady average the engines hold; the area above and below that average gives the battery energy. In the example, a 50 MW average load is balanced by 5 MWh discharged and 5 MWh charged over 60 minutes. The paper also notes that in a four-quadrant inverter real and reactive power share the same apparent-power capacity, so enough kVA headroom must be left for simultaneous response. As a manufacturer paper, it is a general framework; control topologies differ between inverter OEMs.
Key points
- The engine-generator provides steady-state power; the BESS provides sub-second stabilization.
- An AI load can show synchronized swings exceeding 50% to 100% of baseline within seconds.
- Control layers: inverter sub-cycle (below 16.7 ms at 60 Hz, 20 ms at 50 Hz); PMS/PPC 16 ms to 1000 ms; EMS 1 s to 24 hours and beyond.
- Engine response spans several hundred milliseconds to seconds; engines are not designed to react to sudden AI load spikes.
- Battery energy need equals the integral (MWh) of the area between the load curve and the engine's steady output.
- Example: 50 MW average load; 5 MWh discharged and 5 MWh charged over 60 minutes; real engines run at about 80% to 85% load and do some load following.
- In a four-quadrant inverter, kW and kVAr together consume kVA capacity; apparent-power headroom is needed for simultaneous response.
- An adaptive EMS rather than SCADA is recommended for AI data centres; SCADA is limited to fixed-timeframe schedules.
Using it in design
- Size the battery from the area of the load curve around the engine average, and add round-trip efficiency, state-of-charge (SOC) limits and degradation margin separately.
- Select the inverter kVA so it can meet active power response and reactive power support at the same time.
- Write the control hierarchy into the design document: inverter (sub-cycle), PMS/PPC (milliseconds), EMS (hours and days), and define droop settings consistently.
- Coordinate engine ramp and governor settings with the BESS response so engines stay near the average load; set the engine's load-following share separately.
- If the inverter, BESS and PMS suppliers differ, clarify interface and communication responsibilities in the contract.
Who should read it
Electrical designers, microgrid engineers and project developers supplying AI data centres on site with an engine-generator and BESS hybrid.
Document contents
- Introduction
- Glossary of terms
- Focus and framework
- Control layer definitions (inverter, EMS, SCADA, power plant controller, master battery management system)
- Frequency and voltage coordination
- AI load characteristics
- Active power control for fast response
- Inverter OEM control topologies
- Summary
Related standards
- IEEE 1547
- IEEE 2800
Publication details
- Authors
- Justin Lenoff (Rehlko)
- Publisher
- Rehlko
- Year
- 2026
- Document number
- G26-64
- Document language
- English
- Source type
- Manufacturer
- Access
- Free to read
- Licence
- Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note
Vendor white paper; no open licence. Year from PDF metadata (Jul 2026).
Citation
Justin Lenoff (Rehlko) (2026). Managing AI Data Center Loads with Hybrid Power and Grid Forming Inverters. Rehlko. G26-64. https://techcomm.rehlko.com/techcomm/pdf/Rehlko_G26-64_Managing_AI_Data_Center_Loads_with_Hybrid_Power_and_Grid_Forming_Inverters_WP.pdf
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.