Accounting and Tax Benefits of Modular, Portable Data Center Infrastructure
Schneider Electric · Barry Rimler
Schneider Electric WP 115 (Barry Rimler, 2011) looks at the accounting and property-tax side of choosing factory-built modular power infrastructure over field-wired systems, from a US viewpoint. It is not tax advice.
On this page
Overview
The core argument: field-built UPS and PDU systems are usually booked as building or leasehold improvements. Building assets may carry a depreciable life upwards of 30+ years, while DCPI such as UPS and PDUs has a much shorter useful life. That inflates taxable real property and forces write-downs when equipment retires early. Example: a legacy UPS depreciated over 30 years and scrapped after 15 years faces a write-down of 50% of its original value.
Factory-built, cord-connected systems can often be treated as business equipment (personal property) with shorter lives, may avoid permit and inspection fees, and can sit on the computer-room floor without a dedicated UPS room. Inspection fees are usually 2%-3% of the value of the field-constructed portion of a contractor's contract. Avoiding a separate UPS room saves construction cost of roughly $18 to $35 per square foot in office buildings and well beyond $75 per square foot in medium and large standalone data centres. Base rents can range between $19 and $50 per square foot plus taxes, utilities and common areas, so a separate UPS room with aisles is disproportionately expensive except in larger installations.
A seven-step asset-management process ends in cost segregation: 5, 7, 10, 15 and 20 year property is separated from 30 or 39 year property to qualify for accelerated depreciation, and assets must pass the function-and-use and inherent-permanency tests. Tax and tax-related savings can exceed 20% of installed cost for a properly sized and booked factory-built UPS and PDU solution.
Key points
- Building assets may depreciate over 30+ years; DCPI such as UPS and PDUs has a much shorter useful life.
- A UPS depreciated over 30 years and scrapped at 15 faces a write-down of 50% of original value.
- Inspection fees are usually 2%-3% of the field-constructed portion of the contract.
- Avoiding a UPS room saves about $18-35/ft2 in offices and well over $75/ft2 in standalone data centres.
- Base rents of $19-50/ft2 plus taxes, utilities and common areas.
- Cost segregation separates 5/7/10/15/20 year property from 30 or 39 year property.
- Savings can exceed 20% of installed cost for a properly sized and booked factory-built solution.
Using it in design
- Compare UPS placement in a dedicated room and in white space. Include dedicated-room construction cost per ft² or m², adjusted for building type, and occupancy cost in TCO.
- Add an asset class (building_improvement vs business_equipment) and depreciation life per item so stranded-asset write-down can be estimated when refresh cycles are shorter than depreciation life.
- Apply a permit/inspection fee percentage only to field-built scope.
- Label all tax outputs as indicative and jurisdiction-specific.
Who should read it
Designers, finance and corporate real-estate teams assessing infrastructure investment in TCO and asset-class terms.
Publication details
- Authors
- Barry Rimler
- Publisher
- Schneider Electric
- Year
- 2011
- Document number
- WP 115
- Document language
- English
- Source type
- Manufacturer
- Access
- Free to read
- Licence
- Copyright retained; citation only: the publisher’s terms apply to the original document
Citation
Barry Rimler (2011). Accounting and Tax Benefits of Modular, Portable Data Center Infrastructure. Schneider Electric. WP 115. https://download.schneider-electric.com/files?p_Doc_Ref=SPD_BRIR-5Z5T7P_EN
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.