RISE's January 2023 report for the Swedish Energy Agency estimates Swedish data-centre electricity use at 2.8-3.2 TWh in 2022, 4.0-4.4 TWh in 2025 and 4.4-5.2 TWh in 2030.

On this page

Overview

The report (56 pages, in Swedish) is the final report of a consultancy assignment given to RISE (Research Institutes of Sweden) by the Energy Agency for a government task on methods to follow energy use in digital infrastructure and digital systems. The agency published the report in full; the conclusions are the consultant's own, and the agency's analyses are in a separate report (ER 2023:04). Cryptocurrency mining facilities are out of scope. Small in-house data centres are described as typically under 300 kW and cloud company facilities as over 10 MW.

The report says data centres account for about 1-2% of global electricity use, far below the dramatic figures shown in media. It also gives a PUE explanation: an older facility has PUE of about 1.8-2.5 or more, with 50-60% or more of energy going to fans, compressors, pumps and humidification; a very efficient facility has PUE 1.1-1.3. It stresses that PUE measures only the facility side, not how efficiently IT is used.

The estimates are based on the Radar report. For 2022 it calculates 2.8-3.2 TWh; growth is expected to stay above the EU average to 2025 because of large cloud investments and compute loads moving from Europe, but below the 2018-2022 rate because of new tax rules and the economic slowdown. It projects 4.0-4.4 TWh for 2025 and a cautious 4.4-5.2 TWh for 2030.

The report also covers grid integration (peak shaving, energy arbitrage, frequency support services), use of waste heat in industrial symbiosis such as district heating, direct heating and greenhouses, non-energy environmental impacts such as life cycle and water use, power density and air and liquid cooling, edge data centres, and the EU Code of Conduct and EED framework. The work was done in a short time from existing reports, interviews and statistics; in the long term operator reporting is expected to secure data quality.

Key points

  1. Data centres account for about 1-2% of global electricity use.
  2. Swedish data-centre electricity use: 2.8-3.2 TWh in 2022, 4.0-4.4 TWh in 2025, 4.4-5.2 TWh in 2030 (cautious estimate).
  3. Growth after 2022 is assumed to be half the rate in the Radar report.
  4. In-house data centres are typically under 300 kW and cloud facilities over 10 MW.
  5. PUE: older facility about 1.8-2.5 or more, very efficient facility 1.1-1.3; in an older facility 50-60% or more of energy goes to support systems.
  6. Rack density exceeds 50 kW in some installations, making air cooling impractical.
  7. Direct-to-chip liquid cooling can reach temperatures above 60 °C under favourable conditions; in immersion cooling the upper limit often stays below 60 °C.
  8. Grid services: peak shaving, energy arbitrage, frequency support markets; waste heat: district heating (for example Stockholm Data Parks with Stockholm Exergi) and greenhouses.
  9. Crypto mining is out of scope; on the EU side the EED, CSRD, EU taxonomy and the Code of Conduct affect reporting.

Using it in design

  • When forecasting demand for Sweden and Northern Europe, use the 2022-2030 estimate (2.8-3.2, 4.0-4.4, 4.4-5.2 TWh) as a reference range.
  • For sites planning waste-heat use, identify the heat taker (district heating, greenhouse) at the start of design, noting that the waste-heat temperature available from air versus liquid cooling sets the heat-pump requirement.
  • For areas above 50 kW per rack, plan direct-to-chip or immersion cooling together with the residual air-cooling load.
  • When using PUE as the facility-efficiency indicator, monitor IT efficiency (utilisation) separately; add non-energy indicators such as water use and life-cycle impact to the sustainability report.
  • For peak shaving and frequency-support services, clarify the contractual conditions of using the UPS and generator infrastructure early.

Who should read it

Engineers and energy analysts planning data centres in Sweden and Northern Europe, teams assessing grid integration and waste-heat use, and policy developers.

Document contents

  1. Summary
  2. Introduction (electricity use is misunderstood, how data centres work, fact-checking reported energy use, sustainability in data centres)
  3. Scope of the study and data centre basics (categories and characteristics)
  4. Method for assessing energy use of data centres in Sweden
  5. Current status of data centres in Sweden (2020-2022)
  6. Future development of energy use (global trends, video streaming, Sweden beyond 2022)
  7. Integration with the electricity grid (peak shaving, energy arbitrage, support services)
  8. Industrial symbiosis based on waste heat
  9. Environmental impact: sustainability is more than energy efficiency (life cycle, KPIs)
  10. Technology development for future data centres (power density, air and liquid cooling, edge data centres)
  11. Innovations in the Swedish data centre industry
  12. EU digital decade vision, EED and Code of Conduct, other initiatives
  13. Future work and conclusions

Publication details

Authors
RISE Research Institutes of Sweden
Publisher
Swedish Energy Agency (Energimyndigheten)
Year
2023
Document language
Swedish
Source type
Government / public
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

Official agency publication announcement https://www.energimyndigheten.se/nyhetsarkiv/2023/nya-metoder-behovs-for-att-folja-digitaliseringens-energianvandning/ and linked report PDF opened. No explicit redistribution licence established. Consultant authorship is not treated as public-domain status.

Citation

RISE Research Institutes of Sweden (2023). Energianvändning i datacenter och digitala system. Swedish Energy Agency (Energimyndigheten). https://www.energimyndigheten.se/492f27/contentassets/054d98cfdcd54cb5a802e24b53779452/energianvandning-i-datacenter-och-digitala-system.pdf

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Cost studies in SoSo CAD

Calculate equipment cost, energy cost and total cost of ownership (TCO) from the design’s quantities and your own price assumptions.

CAPEX and TCO estimates in the SoSo CAD cost workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.