Türk Tesisat Mühendisleri Derneği (TTMD) · Türk Tesisat Mühendisleri Derneği
Report of the Turkish HVAC and Plumbing Engineers Association (TTMD) online seminar of 22 February 2022: pump room at most 49 C, 1 or 2 hour fire rated or 15.3 m from the building, drain pumps redundant and UPS-backed.
On this page
Overview
The text is a news summary of the online seminar 'Application Errors in Fire Pump Stations' held by the Turkish Society of HVAC and Plumbing Engineers (TTMD) on 22 February 2022. The moderator was Cuneyt Deniz Kuheylan and the speaker Sitki Engin. After brief information on fire pump types and pipe diameters, the speaker gave examples of correct and incorrect practice. The source is the published summary, not the full seminar video.
Topics covered include the pump suction line, vacuum breaker, suction length, valve type and size, compensator, pressure relief valve and lines, flow meter system, fire department connection and the mounting direction of a diesel pump. For pump room ventilation the speaker listed: fresh air inlet and outlet by motorised damper or fan, room at most 49 C, harmful smoke and vapour must be exhausted, natural ventilation with inlet low and outlet high and crossed, motorised dampers and louvres, opened by a command from the relevant panel when pumps run.
On electrical and layout matters the summary calls for monitoring pump run, fault and status signals through the central alarm system, diesel batteries about 30 cm above the floor, and an automatic transfer control panel with generator supply when two electric pumps exist. The pump room should be fire rated for 1 or 2 hours or at least 15.3 m from the building, with a direct exit to the outside. Underground pump rooms need protection against water ingress, a leak sensor, redundant drain pumps on UPS supply and emergency lighting. Commissioning should include and report the checks the standards require.
Key points
- Pump room temperature must not exceed 49 C, and harmful smoke and vapour must be able to leave the room.
- Fresh air inlet and outlet by motorised damper or fan; dampers open on a command from the relevant panel when pumps run.
- With natural ventilation, the air inlet is at low level and the outlet at high level, crossed with each other.
- The pump room is 1 or 2 hour fire rated or at least 15.3 m from the building, with a direct exit to the outside.
- Pump running, fault and status signals are monitored through the central alarm system.
- Diesel batteries about 30 cm above the floor; with two electric pumps, an automatic transfer control panel and generator supply.
- If a diesel pump room adjoins areas such as car parks, fresh air must come from outside, not from those areas.
- Underground pump rooms: prevent external water ingress, leak sensor, redundant drain pumps on UPS supply and emergency lighting.
Using it in design
- Size fire pump room ventilation for the 49 C limit, with motorised dampers opened by the pump-start command.
- Make the pump room 1 or 2 hour fire rated or locate it at least 15.3 m from the building, with a direct exterior exit.
- Connect pump status and fault signals to the building management and fire alarm systems and add the points to the I/O list.
- For basement pump rooms, specify flood leak sensors, redundant drain pumps and UPS supply so fire water is not lost to this risk.
- Include the standard-required commissioning checks and a report format in the specification.
Who should read it
Mechanical engineers designing and commissioning fire pump stations for data centres and other high-risk facilities.
Document contents
- Fire pump types and pipe diameters
- Suction line, valve and compensator practice
- Pressure relief, flow meter, fire department connection, diesel pump mounting
- Pump room ventilation
- Monitoring, electrical supply and room location
- Underground pump room, drainage and commissioning
Publication details
- Authors
- Türk Tesisat Mühendisleri Derneği
- Publisher
- Türk Tesisat Mühendisleri Derneği (TTMD)
- Year
- 2022
- Document language
- Turkish
- Source type
- Industry body
- Access
- Free to read
- Licence
- Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note
Official publisher material inspected. No document-specific commercial redistribution permission established; retain metadata and original short summaries only.
Citation
Türk Tesisat Mühendisleri Derneği (2022). Yangın Pompa İstasyonlarında Uygulama Hataları Anlatıldı. Türk Tesisat Mühendisleri Derneği (TTMD). https://www.ttmd.org.tr/yangin-pompa-istasyonlarinda-uygulama-hatalari-anlatildi
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.