A 2015 UL white paper that summarises the 2013 edition of NFPA 75 chapter by chapter: a one-hour fire-rated IT area, detection at ceiling and under raised floors, and separately valved sprinklers.

On this page

Overview

The paper opens with the cost of outages. A 2013 survey of nearly 600 US operators put the average unplanned outage at 690,000 dollars, with a range from 74,000 to over 1.7 million dollars. It cites fire-related outages in Belfast, Milan and Baton Rouge in 2015 and argues that fire is the least predictable outage cause and the most dangerous one for staff.

The main section walks through the 11 chapters and five informative annexes of NFPA 75 (2013): risk considerations, construction, materials permitted in the IT area, construction of IT equipment, detection and suppression, records, utilities, and emergency procedures. The requirement that IT equipment be certified to ANSI/UL 60950-1 is stressed.

It also describes the change expected in the 2017 edition: alongside the documented risk analysis, a performance-based design option accepted by the authority having jurisdiction. Adoption into local codes may take years. The closing recommendations are to build a fire risk assessment into the design, require NFPA 75 compliance in procurement, consider modular designs, audit periodically and use independent expert advice.

The paper is a readable summary rather than the standard itself and is based on the 2013 edition. The current edition and local regulations must be checked separately, but the chapter structure and underlying logic remain a practical map for design teams.

Key points

  1. A survey puts the average unplanned data centre outage at 690,000 dollars (74,000 dollars to over 1.7 million dollars).
  2. NFPA 75 (2013) separates the IT area from the rest of the building with construction rated at least one hour; doors must be rated at least 45 minutes.
  3. Raised-floor decking and supports must be noncombustible; decking must be fire-retardant treated with a flame spread index of 25 or less (ANSI/UL 723).
  4. IT areas need an automatic sprinkler system, a gaseous clean agent system, or both; the sprinkler system must be valved separately from other systems.
  5. Automatic detection is required at ceiling level and below raised floors housing cables; smoke detection must operate smoke dampers.
  6. Portable extinguishers are carbon dioxide or halogen-based; dry chemical extinguishers are not permitted.
  7. A means to disconnect power to all electronic equipment in the IT area, plus a separate disconnect for dedicated HVAC, is required.
  8. A management emergency fire plan, a damage control plan and a recovery plan for continued operations must each be tested annually.

Using it in design

  • Complete a documented fire risk assessment at project start and base construction and detection decisions on it.
  • Extend the IT hall fire barrier from floor to floor (or roof) and check doors, dampers and cable penetration firestops against the barrier rating.
  • Where cables run under a raised floor, add under-floor detection and, where required, suppression, and confirm detectors and suppression parts are rated for hot-aisle temperatures.
  • Show emergency power-off and HVAC disconnects separately on the electrical drawings and tie smoke damper control to the fire panel.
  • Write NFPA 75 and ANSI/UL 60950-1 compliance into the specification and check the current edition and local code.

Who should read it

Engineers designing data centre fire safety, authorities having jurisdiction and insurers, and teams writing procurement specifications.

Document contents

  1. The Growth of Data Centers
  2. The Cost and Consequences of Data Center Outages
  3. NFPA 75 and Fire Protection, Detection and Mitigation in Data Centers
  4. An Overview of NFPA 75 Requirements
  5. Anticipated Changes
  6. Recommended Methods for Improved Fire Protection in Data Centers

Related standards

  • NFPA 75
  • NFPA 76
  • NFPA 70 Article 645
  • ANSI/UL 60950-1
  • NFPA 101

Publication details

Authors
UL
Publisher
UL
Year
2015
Document language
English
Source type
Manufacturer
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

UL white paper on code-authorities.ul.com; no open licence stated

Citation

UL (2015). NFPA 75 and Fire Protection and Suppression in Data Centers. UL. https://code-authorities.ul.com/wp-content/uploads/sites/40/2015/12/NFPA-75-and-Fire-Protection-and-Suppression-in-Data-Centers-white-paper_final.pdf

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Standards pre-assessment in SoSo CAD

Run TS EN 50600 and Tier pre-checks on the model, with missing inputs and items for engineering review listed separately.

Selected rule packs and findings in the SoSo CAD standards panel

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.