Colocating Artificial Intelligence Data Centers with Energy Infrastructure on Federal Public Lands: A Science Synthesis and Spatial Analysis to Inform Decision Making
U.S. Geological Survey · Sarah E. Whipple, Katherine A. Kurth et al.
A USGS report (SIR 2026-5035) maps 771 AI data centers and 3,339 power plants in the Western US: 38% of BLM lands (over 90 million acres) lie within 10 miles of high-voltage lines, yet only one data centre sits on BLM land.
On this page
Overview
USGS Scientific Investigations Report 2026-5035, first posted in July 2026, gives the Bureau of Land Management (BLM) a scientific base for considering colocation of data centres with energy infrastructure on federal public lands. It combines a rapid literature review done in July-August 2025 with a spatial analysis of Alaska and 11 Western States.
The science synthesis covers data-centre types, access and capacity of energy supply, water and natural resource considerations, climate-driven cooling needs, extreme weather, water use and permitting. US data centres used nearly 2% of national electricity in 2014-2018 and are projected at 6.7-12% by 2028. DOE estimates 57% more transmission infrastructure is needed by 2035 on average. Environmental review and authorisation can take 18-24 months.
The spatial analysis identified 771 AI data centres and 3,339 power plants. In the Western US, 6% of data centres and 22% of power plants are on or within 1 mile of BLM lands, and a single data centre (near Reno) is on BLM land. Over 90 million acres of BLM land, 38%, lie within 10 miles of existing high-voltage lines. 50% of data centres are within 2.01 miles of a power plant and 90% within 7.54 miles.
The cooling analysis uses a server temperature of 80.6 °F (27 °C) or below and cooling degree days; rising temperatures in Arizona, California and Nevada are expected to raise cooling energy and costs. The report is not a comprehensive suitability, ecological or permitting analysis; water availability, critical habitats and cultural areas are excluded and it does not recommend optimal areas.
Key points
- Scope: Alaska and 11 Western States; 771 AI data centres and 3,339 power plants (solar 1,479, hydro 613, gas 495, wind 345).
- 6% of data centres and 22% of power plants are on or within 1 mile of BLM lands; 49 data centres and about 750 power plants within 1 mile, with only 1 data centre on BLM land (near Reno).
- More than 90,000,000 acres of BLM lands (38%) lie within 10 miles of existing high-voltage lines; overlap is limited in Alaska.
- 10% of data centres are within 0.29 miles of a power plant, 50% within 2.01 miles and 90% within 7.54 miles; the farthest is nearly 50 miles. Access to lines of 100 kV and above matters more than power-plant proximity.
- US data centres used nearly 2% of national electricity in 2014-2018; 6.7-12% is projected by 2028.
- DOE estimates the US needs on average 57% more transmission infrastructure by 2035.
- Environmental review and authorisation can take 18-24 months; coordination with transmission projects may add delay.
- Servers run most efficiently at or below 80.6 °F (about 27 °C); cooling demand will rise in Arizona, California and Nevada.
- Energy-efficient water-based cooling cuts electricity but raises water use and can add to water stress.
Using it in design
- In site screening, check proximity to 100 kV and above lines (for example within 10 miles) and spare capacity first; power-plant proximity is secondary.
- For hot-climate sites use cooling degree-day data to compute cooling energy and water need under current and future climate scenarios.
- Run water availability and water-stress analysis as a separate step; the report excludes water, habitat and cultural areas.
- Add 18-24 months of environmental review and possible transmission coordination delay to the permitting schedule.
- Use the report's data as context only; carry out separate suitability and permitting analysis for site choice.
Who should read it
Developers, energy planners and public agencies planning data centres on federal land or near transmission lines in the US.
Document contents
- Introduction: executive orders, goals and objectives
- Science synthesis: data-centre types, development considerations, energy supply, natural resources, climate-driven cooling, extreme weather, water use, policy and permitting, colocation
- Spatial analysis: existing data centres and power plants, transmission lines, future energy demand and resource conditions
- Methods, assumptions and limitations
- Conclusion
Publication details
- Authors
- Sarah E. Whipple; Katherine A. Kurth; Catherine A. Nikiel; Andy J. Maguire; Jay R. Alder; Julian J.T. Reyes; Julian A. Scott; Sarah K. Carter
- Publisher
- U.S. Geological Survey
- Year
- 2026
- Document number
- Scientific Investigations Report 2026-5035
- Document language
- English
- Source type
- Government / public
- Access
- Free to read
- Licence
- Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note
Publisher public source inspected. No document-specific commercial redistribution permission established; metadata and original short summaries only.
Citation
Sarah E. Whipple; Katherine A. Kurth; Catherine A. Nikiel; Andy J. Maguire; Jay R. Alder; Julian J.T. Reyes; Julian A. Scott; Sarah K. Carter (2026). Colocating Artificial Intelligence Data Centers with Energy Infrastructure on Federal Public Lands: A Science Synthesis and Spatial Analysis to Inform Decision Making. U.S. Geological Survey. Scientific Investigations Report 2026-5035. https://doi.org/10.3133/sir20265035
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.