7x24 Exchange Fall Conference
About the event
7x24 Exchange national conference on the design, operation and resilience of mission-critical infrastructure, suited to data centre operators, facility managers and engineering firms.
Venue
This event has ended. The page is kept in the archive with its details and related technical reading.
Read before you go
Explore the libraryHuawei Digital Power 2025
Huawei AI Data Center Reference Design
Import RD 01-21 as parametric AI-hall templates (rack kW, racks per module, module kW, redundancy of fan walls/TMUs/towers, generator and transformer counts) and as golden test cases for capacity math.
- Power distribution supports 2N, DR and BR architectures.
Eaton / Trane 2025
Reference Design #505: Eaton 1 GW Power Architecture Meets Trane Thermal Management
Voltage-selection rule: motors above about 200 kW (large chillers and pumps) default to MV (4.16/6.6/11 kV) feeders; compute I = P/(sqrt(3) x V x PF) to show cable savings.
- 1,500 HP pump: 1,420 A at 480 V vs 164 A at 4.16 kV
BICSI (via Cabling Installation & Maintenance) 2019
ANSI/BICSI 002-2019, Data Center Design and Implementation Best Practices (release announcement)
Keep BICSI 002 edition history (2014, 2019, 2024) in the standards registry for projects citing older editions.
- Previous edition; superseded by BICSI 002-2024.
SoSo CAD
Assess redundancy through scenarios
Compare normal operation and equipment failures in SoSo CAD, with supplied loads and capacity shortfalls in one view.
Request a demo