Data Center Nation Riyadh
About the event
One-day data centre summit and exhibition in Riyadh bringing together data centre operators, investors, designers and suppliers.
Who it is for / why attend
One-day summit for Saudi DC operators, hyperscalers, consultants and investors, with 1,000+ attendees in 2026. For design and MEP firms seeking Gulf projects, it is a way to get to know the regional market.
Venue
Dates and details are compiled from official organiser sources. Check the official website for the programme, admission requirements and registration status before making plans.
Read before you go
Explore the libraryHuawei Digital Power 2025
Huawei AI Data Center Reference Design
Import RD 01-21 as parametric AI-hall templates (rack kW, racks per module, module kW, redundancy of fan walls/TMUs/towers, generator and transformer counts) and as golden test cases for capacity math.
- Power distribution supports 2N, DR and BR architectures.
ABB 2026
Next-Generation Medium-Voltage Architecture for AI Data Centers
For loads above roughly 30-50 MW add a grid-code compliance checklist (LVRT duration, frequency band, RoCoF, PF) and let users choose LV-UPS versus MV-UPS architecture.
- BESS blocks 0.6-21.6 MW with 1, 2 or 4 h durations
Eaton / Trane 2025
Reference Design #505: Eaton 1 GW Power Architecture Meets Trane Thermal Management
Voltage-selection rule: motors above about 200 kW (large chillers and pumps) default to MV (4.16/6.6/11 kV) feeders; compute I = P/(sqrt(3) x V x PF) to show cable savings.
- 1,500 HP pump: 1,420 A at 480 V vs 164 A at 4.16 kV