Data Centre World London
About the event
Trade fair and conference within Tech Show London covering data centre design, power, cooling and operations, aimed at data centre managers, designers, engineers and suppliers.
Venue
This event has ended. The page is kept in the archive with its details and related technical reading.
Read before you go
Explore the libraryHuawei Digital Power 2025
Huawei AI Data Center Reference Design
Import RD 01-21 as parametric AI-hall templates (rack kW, racks per module, module kW, redundancy of fan walls/TMUs/towers, generator and transformer counts) and as golden test cases for capacity math.
- Power distribution supports 2N, DR and BR architectures.
ABB 2026
Next-Generation Medium-Voltage Architecture for AI Data Centers
For loads above roughly 30-50 MW add a grid-code compliance checklist (LVRT duration, frequency band, RoCoF, PF) and let users choose LV-UPS versus MV-UPS architecture.
- BESS blocks 0.6-21.6 MW with 1, 2 or 4 h durations
Eaton / Trane 2025
Reference Design #505: Eaton 1 GW Power Architecture Meets Trane Thermal Management
Voltage-selection rule: motors above about 200 kW (large chillers and pumps) default to MV (4.16/6.6/11 kV) feeders; compute I = P/(sqrt(3) x V x PF) to show cable savings.
- 1,500 HP pump: 1,420 A at 480 V vs 164 A at 4.16 kV
SoSo CAD
Review your power design in SoSo CAD
Inspect supply paths, equipment loads and UPS failure scenarios in one model.
Request a demo