Datacloud USA
About the event
Austin conference co-located with Metro Connect Fall and Datacloud Energy USA on US data centre development, power procurement and finance, aimed at developers, operators and investors.
Who it is for / why attend
For senior executives and investors developing US data centres. Previous-edition themes were power constraints, cooling vs rack density, permitting and capital; forums include Nuclear for AI and Investment & Finance.
Venue
Dates and details are compiled from official organiser sources. Check the official website for the programme, admission requirements and registration status before making plans.
Read before you go
Explore the libraryABB 2026
Next-Generation Medium-Voltage Architecture for AI Data Centers
For loads above roughly 30-50 MW add a grid-code compliance checklist (LVRT duration, frequency band, RoCoF, PF) and let users choose LV-UPS versus MV-UPS architecture.
- BESS blocks 0.6-21.6 MW with 1, 2 or 4 h durations
Eaton / Trane 2025
Reference Design #505: Eaton 1 GW Power Architecture Meets Trane Thermal Management
Voltage-selection rule: motors above about 200 kW (large chillers and pumps) default to MV (4.16/6.6/11 kV) feeders; compute I = P/(sqrt(3) x V x PF) to show cable savings.
- 1,500 HP pump: 1,420 A at 480 V vs 164 A at 4.16 kV
Siemens 2013
Totally Integrated Power - Application Models for Power Distribution: Data Centres
Use the tier factors as defaults in the early-stage area estimator: grey space = white space x factor.
- Critical (ICT) to infrastructure power split is about 2:1 (PUE about 1.5).