The loop is filled once during construction and circulates between servers and chillers, with no fresh-water make-up for cooling. Chip-level cooling permits warmer coolant temperatures, so high-efficiency economizing chillers offset the energy penalty of dropping evaporation. The design is said to avoid more than 125 million litres of water per datacenter per year, a figure based on the FY24 withdrawal WUE of 0.30 L/kWh.
Fleet WUE was 0.30 L/kWh in FY24, a 39% improvement from 0.49 L/kWh in 2021 and about 80% better than first-generation datacenters. Replacing evaporative systems with mechanical cooling raises PUE; the post describes the net effect as a nominal increase in annual energy and gives no numeric PUE value. The timeline is explicit: all new designs use this approach from August 2024, pilots in Phoenix and Mt. Pleasant were planned for 2026, and the first sites come online from late 2027.
The post is a corporate announcement; it carries no engineering detail such as pipe sizes, CDU sizing or water temperatures, and it does not quantify the energy cost. The 125 million litres is therefore an estimate derived from the FY24 WUE, not a measured result. Warmer coolant increases the hours in which economizing chillers can run without mechanical cooling; the size of that gain is not given in the post.
Key points
- The design avoids more than 125 million litres of water per year per datacenter (based on FY24 withdrawal WUE of 0.30 L/kWh).
- Fleet WUE 0.30 L/kWh in FY24, a 39% improvement from 0.49 L/kWh in 2021; about 80% better than first-generation sites.
- Replacing evaporative systems with mechanical cooling raises PUE; net effect is a nominal increase in annual energy.
- Closed loop filled during construction, no fresh-water make-up for cooling.
- All new designs from August 2024; first sites online late 2027.
- Pilots in Phoenix and Mt. Pleasant were planned for 2026.
Using it in design
- Add 'closed-loop DLC + dry cooler / air-cooled economizing chiller (zero-evaporation)' to the cooling-option catalog with WUE_cooling about 0.
- Define a PUE penalty parameter versus evaporative cooling (default +0.02-0.05, user-editable; this value does not come from the source).
- Raise facility water temperature (e.g. W32-W45) to increase economizer hours and show water saved per MW-year.
Monthly newsletter · free
Keep your reading list current
Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.
SoSo CAD
Check cooling capacity alongside your design
Review zone heat loads, available capacity and the capacity balance after the largest unit is lost in SoSo CAD.
Request a demo
Who should read it
Mechanical designers and sustainability managers weighing the energy and water balance of giving up evaporative cooling.
Related standards
- ASHRAE TC9.9 Liquid Cooling Guidelines
- ISO/IEC 30134-9
Publication details
- Authors
- Steve Solomon
- Publisher
- Microsoft
- Year
- 2024
- Document language
- English
- Source type
- Expert / community
- Access
- Free to read
- Licence
- Copyright retained; citation only — the publisher’s terms apply to the original document
Citation
Steve Solomon (2024). Sustainable by design: Next-generation datacenters consume zero water for cooling. Microsoft. https://www.microsoft.com/en-us/microsoft-cloud/blog/2024/12/09/sustainable-by-design-next-generation-datacenters-consume-zero-water-for-cooling/
Events on this subject
Browse the events calendarAll content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.