An open-data model links a data centre's cooling configuration and electricity demand to hourly grid economic dispatch (PyPSA), generator-level water consumption intensity and monthly subbasin depletion, applied to a 200 MW IT facility in Michigan.
CC BY 4.0 — share with attribution
On this page
Overview
Data centres are being developed at an unprecedented pace, yet their energy and water impacts, and the spatial and temporal distribution of those impacts, remain poorly characterised. Existing assessment frameworks rely on facility efficiency metrics and average grid water intensity factors, suppressing the temporal impacts of data-centre load and generation availability. The model compares a water-cooled chiller, an air-cooled chiller and a hybrid airside economiser / water-cooled plant for a 200 MW IT facility in Michigan, and also looks at multi-gigawatt build-out siting cases.
For a fixed 200 MW IT load, moving from a water-cooled to an air-cooled chiller cut direct water by 97% (6.45 to 0.21 million m³/yr) and raised facility electricity by 32% (3.08 to 4.06 TWh). The same switch raised indirect water by 32% (4.48 to 5.91 million m³) but cut total water by 44% (10.93 to 6.12 million m³); the indirect share went from 41.0% to 96.6%. The hybrid airside economiser / water-cooled plant had the lowest electricity (2.76 TWh) and indirect water (3.98 million m³), with 3.20 million m³ direct water; its total of 7.19 million m³ was 34% below the water-cooled chiller.
Hybrid mode used the economiser only when daily mean temperature was at or below 27 °C and mean RH at or below 70%, which held for only 25% of the year in Michigan. Indirect water intensity varied by about 50% across months, depending on which generators supplied the added load. Higher electricity demand from air cooling raised depletion in subbasins away from the data-centre site, which facility-level reporting would miss.
The finding is that cooling configuration shifts water consumption from the facility to electricity generation, annual-average grid water factors hide large monthly variation, and water consumption magnitude alone cannot determine water impact. Limits: a single region (Michigan) and an open-data model; values depend on this grid mix and the cooling assumptions.
Key points
- For a fixed 200 MW IT load, moving from a water-cooled to an air-cooled chiller cut direct water by 97% (6.45 to 0.21 million m³/yr) and raised facility electricity by 32% (3.08 to 4.06 TWh).
- The same switch raised indirect water by 32% (4.48 to 5.91 million m³) but cut total water by 44% (10.93 to 6.12 million m³); the indirect share went from 41.0% to 96.6%.
- The hybrid airside economiser / water-cooled plant had the lowest electricity (2.76 TWh) and indirect water (3.98 million m³), with 3.20 million m³ direct water; its total of 7.19 million m³ was 34% below the water-cooled chiller.
- Hybrid mode used the economiser only when daily mean temperature was at or below 27 °C and mean RH at or below 70%, which held for only 25% of the year in Michigan.
- Indirect water intensity varied by about 50% across months, depending on which generators supplied the added load.
- Higher electricity demand from air cooling raised depletion in subbasins away from the data-centre site, which facility-level reporting would miss.
Using it in design
- In cooling selection, calculate direct and indirect water together: an air-cooled chiller cut direct water 97% but raised the indirect share to 96.6% and electricity by 32%.
- Assess water impact with monthly varying intensity (about 50% variation) rather than an annual-average grid water factor; which generators serve the load matters.
- Check the hybrid economiser's usage thresholds (27 °C, 70% RH) against project climate data; in Michigan they held for only 25% of the year.
Monthly newsletter · free
Keep your reading list current
Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.
SoSo CAD
Check cooling capacity alongside your design
Review zone heat loads, available capacity and the capacity balance after the largest unit is lost in SoSo CAD.
Request a demo
Who should read it
Planners and policy specialists weighing direct and indirect water impacts in data-centre siting, cooling selection and water reporting.
Document contents
- 1. Introduction
- 2. Methods (IT-load representation, industry data: PUE and WUE metrics, grid operations and generator dispatch, generator water consumption)
- 3. Case study (Michigan electricity system grid data)
- 4. Results
- 5. Discussion: water consumption magnitude alone cannot determine water impact
- 6. Conclusion
Related standards
- ISO/IEC 30134-9 (WUE)
- ISO/IEC 30134-2 (PUE)
Read the document
dc-cooling-choices-grid-water-impacts-2026.pdf
CC BY 4.0 — share with attribution
The document is provided unaltered because its licence permits redistribution.
Publication details
- Authors
- Garrett Alston; Nancy Love; Rabab Haider
- Publisher
- arXiv (University of Michigan preprint)
- Year
- 2026
- Document number
- arXiv:2609.25437
- Document language
- English
- Source type
- Scientific
- Access
- Open licence — downloadable
- Licence
- CC BY 4.0 — share with attribution
- Licence evidence
- arxiv.org
Original licence note
arXiv OAI-PMH metadata lists the licence as http://creativecommons.org/licenses/by/4.0/ (CC BY 4.0).
Citation
Garrett Alston; Nancy Love; Rabab Haider (2026). Data Center Cooling Choices Shift Water Impacts Across the Grid: An Integrated Water-Energy Model for Sustainable Data Center Development. arXiv (University of Michigan preprint). arXiv:2609.25437. https://doi.org/10.48550/arXiv.2609.25437
Events on this subject
Browse the events calendarAll content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.