White paperFree to read2023

3 Steps to Calculate Total Enterprise IT Energy Consumption Using DCIM

Schneider Electric · Robert Moore, Patrick Donovan

Schneider Electric WP 100 (Robert Moore, Patrick Donovan, 2023) is a three-step starter guide for organisations that need to report the energy use of their whole IT estate.

On this page

Overview

Scope covers not only on-premise data centres but also distributed edge sites, end-user devices and outsourced cloud and colocation capacity. The one recommended metric is total energy consumption (kWh/MWh). It includes grid electricity and onsite generation (generators, solar, wind), plus imported natural gas, steam or chilled water where applicable.

The three steps are: assess coverage, pick data sources and fill metering gaps, then aggregate in DCIM. Distributed IT sites are defined as fewer than 10 IT racks plus non-racked IT equipment. Recommended minimum sources are a utility meter or invoices for on-premise data centres, the built-in UPS power meter for edge sites, power rating x time for end-user devices, and vendor reports or a tenant portal for outsourced capacity.

Two estimation rules cover missing meters: for unmetered devices use 60% of the manufacturer's power rating times assumed hours of use; where upstream power and cooling are shared or unmeasured, multiply IT energy at the UPS output by the site PUE. Power dependencies must be modelled correctly in DCIM or pairs such as a UPS and its downstream rack PDU get double counted. An appendix converts energy to location-based Scope 2 emissions: energy x emission factor (tCO2/MWh). Beginners are told to use the location-based method with local, or else national or regional, factors. The GHG Protocol Scope 2 Guidance and ISO/IEC 30134-2 are the related references.

Key points

  1. Total energy: grid electricity, onsite generation and, where applicable, imported gas, steam or chilled water.
  2. Unmetered devices: 60% of manufacturer rating x assumed hours of use.
  3. Shared or unmeasured infrastructure: UPS-output IT energy x site PUE.
  4. Distributed IT site: fewer than 10 IT racks plus non-racked equipment.
  5. Minimum sources: meter/invoices on-premise, UPS meter at edge, power x time for end-user devices, vendor report or portal for outsourced.
  6. DCIM power dependencies (a UPS and its rack PDU) must be defined to avoid double counting.
  7. Emissions = energy x factor (tCO2/MWh); location-based method for beginners.

Using it in design

  • Model each meter point as a power-tree node with an aggregate flag so roll-ups never sum a parent and its child.
  • Provide an estimate mode when facility meters are absent: IT kWh at UPS output x design PUE.
  • Add an editable 60%-of-nameplate default for unmetered devices.
  • Add a per-site emission factor field (tCO2/MWh) and flag sites with no metering point at the UPS output.

Monthly newsletter · free

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.

SoSo CAD

Compare the cost of design decisions

Evaluate equipment costs, energy expenses and total cost of ownership (TCO) using your inputs and assumptions in SoSo CAD.

Request a demo
CAPEX and TCO estimates in the SoSo CAD cost workspace

Who should read it

Staff building enterprise IT energy and emissions reporting, and DCIM implementers.

Related standards

  • GHG Protocol Scope 2 Guidance
  • ISO/IEC 30134-2

Publication details

Authors
Robert Moore; Patrick Donovan
Publisher
Schneider Electric
Year
2023
Document number
WP 100
Document language
English
Source type
Manufacturer
Access
Free to read
Licence
Copyright retained; citation only — the publisher’s terms apply to the original document

Citation

Robert Moore; Patrick Donovan (2023). 3 Steps to Calculate Total Enterprise IT Energy Consumption Using DCIM. Schneider Electric. WP 100. https://download.schneider-electric.com/files?p_Doc_Ref=SPD_WP100_EN

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.