Sustainability Benefits of Prefabricated Data Centers: Core and Shell Carbon Reduction
Schneider Electric · Suraj Manohar Desai, Mahesha Munanjanappa et al.
A Schneider Electric white paper comparing the construction-phase (core and shell) embodied carbon of a traditional stick-built electrical room with an equivalent set of prefabricated power modules.
On this page
Overview
The paper concentrates on a narrow, measurable question: for the same electrical capacity, does an electrical room built on site or a set of prefabricated power modules made in a factory and shipped produce less carbon? The comparison covers only construction-phase (core and shell) embodied carbon; operating energy is outside the evaluation. Four emission sources are counted: above-ground site clearing, freight, on-site construction activity and materials.
The main result is that prefabricated power modules cut core-and-shell construction carbon by about 80% at deployment compared with a stick-built electrical room, which corresponds to an embodied-carbon multiplier of roughly 0.2 for the modular option. The paper also tests whether the advantage fades: even if module enclosures are replaced every 20 years, cumulative embodied carbon stays more than 50% lower after 60 years.
This shows that the modular route carries an end-of-life replacement burden, but that burden does not erase the saving at deployment. The limit is scope: only the electrical room is compared, so nothing is concluded for the whole building or for cooling infrastructure. The authors present prefabrication as a carbon-reduction lever; cost, schedule and operating-performance comparisons are not what this paper is about.
Key points
- Prefabricated power modules cut core-and-shell construction carbon by about 80% at deployment.
- With enclosures replaced every 20 years, cumulative embodied carbon stays more than 50% lower after 60 years.
- Four emission sources: above-ground site clearing, freight, on-site construction and materials.
- The comparison is a stick-built electrical room against equivalent prefabricated power modules.
- Scope is construction-phase embodied carbon only.
Using it in design
- Add a construction-method option for electrical rooms: stick-built or prefabricated module.
- Use an embodied-carbon multiplier of about 0.2 for the prefabricated option at deployment.
- Default the enclosure service life to 20 years and include replacement within a 60-year horizon in lifecycle carbon calculations.
- Show the cumulative curves of the two methods side by side in the carbon report.
Monthly newsletter · free
Keep your reading list current
Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.
SoSo CAD
Compare the cost of design decisions
Evaluate equipment costs, energy expenses and total cost of ownership (TCO) using your inputs and assumptions in SoSo CAD.
Request a demo
Who should read it
Project managers choosing an electrical-room construction method and sustainability engineers computing embodied carbon.
Related standards
- EN 15978
- ISO 21930
Publication details
- Authors
- Suraj Manohar Desai; Mahesha Munanjanappa; Wendy Torell; Ray Lizotte
- Publisher
- Schneider Electric
- Year
- 2026
- Document number
- WP 240
- Document language
- English
- Source type
- Manufacturer
- Access
- Free to read
- Licence
- Copyright retained; citation only — the publisher’s terms apply to the original document
Citation
Suraj Manohar Desai; Mahesha Munanjanappa; Wendy Torell; Ray Lizotte (2026). Sustainability Benefits of Prefabricated Data Centers: Core and Shell Carbon Reduction. Schneider Electric. WP 240. https://download.schneider-electric.com/files?p_Doc_Ref=SPD_WP240_EN
Events on this subject
Browse the events calendarAll content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.