This document is the press release for the seventh annual outage analysis report that Uptime Institute announced in May 2025. It summarises the main results of the yearly review of data center and IT outage frequency, severity and causes. It does not replace the full report; it is an entry point for anyone who wants a quick view of the industry's reliability trend. The first finding is positive: outage frequency and reported severity declined for the fourth consecutive year.

Even so, power remains the leading cause of impactful outages, and IT and networking issues totalled 23% in 2024. That distribution suggests that investment in electrical infrastructure is still where reliability effort matters most. On the human side, outages caused by failure to follow procedures rose by ten percentage points compared with 2024. The release also states that third-party IT and data center providers account for about two thirds of publicly reported outages over nine years.

For organisations that outsource, this means supplier risk deserves serious attention. The limits should be understood. This is a press release that points to a 9-page executive summary excerpt of a 26-page report; the detailed data, full breakdown of causes and methodology sit in the full report. Publicly reported outages represent only those that reached the public, not all outages.

Key points

  1. Outage frequency and reported severity declined for the fourth consecutive year.
  2. Power remains the leading cause of impactful outages.
  3. IT and networking issues totalled 23% in 2024.
  4. Human-error outages from failure to follow procedures rose by ten percentage points versus 2024.
  5. Third-party IT and data center providers account for about two thirds of publicly reported outages over nine years.
  6. The release points to a 9-page executive summary excerpt of a 26-page report.

Using it in design

  • When presenting availability improvements, emphasise procedure adherence and training alongside topology.
  • In the operations module, treat human-error risk as a separate line item.
  • In power infrastructure decisions, cite power as still the dominant outage cause as justification.
  • In outsourcing scenarios, include third-party provider risk in the assessment.

Monthly newsletter · free

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.

SoSo CAD

Assess redundancy through scenarios

Compare normal operation and equipment failures in SoSo CAD, with supplied loads and capacity shortfalls in one view.

Request a demo
Normal operation and failure scenario comparison in SoSo CAD

Who should read it

Engineers, facility managers and investment decision makers setting reliability and operations strategy.

Publication details

Authors
Uptime Institute
Publisher
Uptime Institute
Year
2025
Document language
English
Source type
Industry body
Access
Free to read
Licence
Copyright retained; citation only — the publisher’s terms apply to the original document
Original licence note

Publisher press release / public web page; copyright Uptime Institute, no open licence. Citation only.

Citation

Uptime Institute (2025). Uptime Annual Outage Analysis 2025 (7th annual) - press release. Uptime Institute. https://uptimeinstitute.com/about-ui/press-releases/uptime-announces-annual-outage-analysis-report-2025

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.