Veri Merkezi Kurulumu Fizibilite Analizi Çalışması
Ahiler Kalkınma Ajansı
Ahiler Development Agency's November 2024 study puts the initial cost of a Nevşehir underground (cave) data centre at an average of US$9.24 million, with Ankara 22% and Istanbul 45% higher and the lowest annual cooling cost in Nevşehir.
On this page
Overview
The study is a roughly 140-page report by the regional development agency assessing the feasibility of a minimum Tier 3 data centre in Nevşehir, particularly in a cave environment. It covers five areas: project framework, data-centre overview (definitions, standards, underground examples), world and Turkey market analysis, technical analysis (natural and environmental factors, energy, transport, climate, sustainability) and cost analysis (CAPEX and OPEX).
The executive summary compares costs: initial setup of an underground data centre in Nevşehir averages US$9,240,476 (range about US$8.4-9.6 million), Ankara US$10,978,571 (22% higher) and Istanbul US$13,036,786 (45% higher). Annual cooling energy cost is US$146,452 in Nevşehir, 19% higher in Ankara and 24% higher in Istanbul; total annual operating cost is US$1,006,097 in Nevşehir, with Ankara 3% and Istanbul 4% higher. Staff, maintenance and other items are assumed equal across the three cities.
The technical analysis gives Nevşehir's climate as -2 to 4 °C average in winter and 20-35 °C in summer (peak 40 °C). Based on May-September averages, cooling operating cost is forecast to be 10% lower than Ankara and 16% lower than Istanbul. In the cave/storage example, a system room needing 200 kW of cooling receives about 20 kW from the storage environment, and at least 10% of cooling demand can be met from the cave. Risks listed include humidity, water ingress, active faults such as the Gümüşkent Fault and volcanism; the recommended environment is 18-27 °C and 40-60% relative humidity.
It is a pre-feasibility study, not an engineering design, and figures rest on scenario assumptions. The report also discusses positioning Nevşehir as a backup site for Istanbul, Izmir and Ankara and the employment and investment benefits.
Key points
- Initial underground data centre cost: Nevşehir averages US$9,240,476; Ankara US$10,978,571 (22% higher); Istanbul US$13,036,786 (45% higher).
- Annual cooling energy cost: Nevşehir US$146,452, Ankara US$174,278 (19% higher), Istanbul US$181,600 (24% higher).
- Total annual operating cost: Nevşehir US$1,006,097, Ankara US$1,033,923 (3% higher), Istanbul US$1,041,245 (4% higher).
- Fixed items: staff US$400,000, maintenance contracts US$425,000, miscellaneous US$20,000, other energy (lighting, CCTV) US$14,645.
- Nevşehir climate: winter average -2 to 4 °C (minimum -10 °C), summer average 20-35 °C (maximum 40 °C), annual rainfall 400-450 mm.
- On May-September average temperature, cooling operating cost is 10% lower in Nevşehir than Ankara and 16% lower than Istanbul.
- Example calculation: for a system room needing 200 kW of cooling, the cave store provides about 20 kW; at least 10% of cooling demand can come from the cave environment.
- Recommended operating environment is 18-27 °C and 40-60% relative humidity; IT rooms closed-loop air-conditioned, fully sealed and filtered.
- Risks: cave humidity and water ingress, active faults such as the Gümüşkent Fault, low-probability volcanism (Acıgöl and Göllü Dağı about 55 km away).
Using it in design
- In underground data-centre feasibility, scale the passive cooling from the cave or store using a site-measured value, such as the 20 kW contribution assumed against a 200 kW demand.
- Compare the underground option's CAPEX against city-based alternatives on the same scope (Ankara 22%, Istanbul 45% higher in this study).
- Add insulation, drainage, continuous humidity and temperature monitoring and automatic climate intervention for humidity and water ingress.
- Assess earthquake and fault risk through site geotechnical studies and review cave structural stability separately.
- Define the design environment as 18-27 °C and 40-60% humidity; make IT rooms fully sealed with closed-loop air conditioning.
Who should read it
Investors, development agencies and design consultants carrying out feasibility for data centres underground or in climate-advantaged regions of Turkey.
Document contents
- Executive summary
- Project overview: scope, objectives, schedule, constraints
- Data centre overview: definitions, technologies, standards, underground examples
- Market analysis: world and Turkey
- Technical analysis: natural and environmental factors, energy, communications, transport, climate, sustainability
- Cost analysis: CAPEX and OPEX
- Annex 1: cost analysis details
- Annex 2: air-conditioning and cooling analysis of Nevşehir underground cold stores
Publication details
- Authors
- Ahiler Kalkınma Ajansı
- Publisher
- Ahiler Kalkınma Ajansı
- Year
- 2024
- Document language
- Turkish
- Source type
- Government / public
- Access
- Free to read
- Licence
- Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note
Public publisher source inspected. Free reading is not commercial redistribution permission; metadata and original short summaries only.
Citation
Ahiler Kalkınma Ajansı (2024). Veri Merkezi Kurulumu Fizibilite Analizi Çalışması. Ahiler Kalkınma Ajansı. https://www.ahika.gov.tr/assets/upload/dosyalar/veri-merkezi-fizibilite-calismasi.pdf
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.