The Energy Cost of Digital Transformation: Future Energy Demand of Turkey's Data Centers
Original title Dijital Dönüşümün Enerji Bedeli: Türkiye Veri Merkezlerinin Gelecekteki Enerji Talebi
Türkiye Elektrik Sanayi Birliği (TESAB) / CIGRE Türkiye · Mutlu Bektaş
A paper from the IV. Power Systems Conference that assesses the possible impact of data-centre growth in Turkey on electricity demand and the grid using published forecasts and national planning data.
On this page
Overview
The paper (5-6 November 2025 Ankara, paper 177, pages 140-144) begins from the observation that AI development has raised data-centre energy consumption and put demand pressure on electricity grids. The study relies on data from international reports and publications; it has no measurements of its own and no grid connection capacity calculation. It first describes what a data centre is and its global distribution (North America, Asia-Pacific, Europe), then the situation in Turkey.
For Turkey the paper states that there are 82 data centres, that the number has roughly doubled in the last 8 years, and that activity is concentrated mainly in Istanbul. Total public and private data-centre capacity reached about 250 MW as of 2023; it is projected to reach at least 500 MW within 5 years and 750 MW in the ideal scenario. Data-centre investment volume in the country grew 25% in 2023 and 30% in 2024. Among OECD countries Turkey ranks near the bottom in data centres per million people, and the correlation coefficient between GDP per capita and the number of data centres is 0.825.
In global context, according to values attributed to the IEA, world data-centre electricity demand is expected to more than double to about 945 TWh by 2030; according to the Lawrence Berkeley National Laboratory's 2024 report, 4.4% of all US energy goes to data centres. A ChatGPT query is reported to use 2.9 Wh and a Google search 0.3 Wh. Turkey's electricity demand grew at a compound annual rate of 4.2% in 2000-2023, and under the National Energy Plan consumption is expected to be 380.2 TWh in 2025, 455.3 TWh in 2030 and 510.5 TWh in 2035.
The conclusion says that a data-centre capacity expected to reach 750 MW poses no risk against national electricity consumption forecasts, but will cause sudden and rapid increases in regional and provincial demand. It recommends adding data centres as a new item in grid expansion plans, incentives for data centres using renewable energy, and energy storage. The scenarios and secondary-source market counts in the document are not measurements or committed connection-capacity forecasts.
Key points
- Turkey has 82 data centres; the number has roughly doubled in 8 years and activity is concentrated mainly in Istanbul.
- Total data-centre capacity was about 250 MW in 2023; at least 500 MW within 5 years and 750 MW in the ideal scenario are projected.
- Data-centre investment volume grew 25% in 2023 and 30% in 2024.
- Turkey's electricity demand grew at a compound annual 4.2% in 2000-2023.
- National Energy Plan: 380.2 TWh in 2025, 455.3 TWh in 2030, 510.5 TWh in 2035.
- Attributed to the IEA: world data-centre demand to more than double to about 945 TWh by 2030.
- A ChatGPT query uses 2.9 Wh and a Google search 0.3 Wh (attributed to the IEA).
- No risk is seen against national forecasts; the real effect is sudden regional and provincial demand growth.
- Recommendations: include data centres in grid plans, incentives for renewable-powered data centres, energy storage.
Using it in design
- In site selection in Turkey, investigate regional grid capacity and the relevant transmission operator's investment plan rather than the national total; the paper says the main pressure is regional.
- Stage the demand growth scenario in the connection application; the growth from 250 MW to 500-750 MW in the paper gives country-level context and is not a connection commitment for a project.
- Assess energy storage and renewable integration as options that reduce grid pressure early in design.
- Use the figures in this paper as secondary-source scenarios, not as measurements; connection capacity needs discussions with TEIAS and the distribution company.
- Do not plan capacity for AI load on conventional load forecasts alone; include rapid-growth scenarios.
Who should read it
Electrical engineers, investors and grid planners working on data-centre site selection and grid connection in Turkey.
Document contents
- Abstract
- 1. Introduction
- 2. What is a data centre? (global situation, data centres in Turkey)
- 3. Data centres in energy demand
- 4. Conclusions
- 5. References
Publication details
- Authors
- Mutlu Bektaş
- Publisher
- Türkiye Elektrik Sanayi Birliği (TESAB) / CIGRE Türkiye
- Year
- 2025
- Document number
- IV. Güç Sistemleri Konferansı, paper 177; proceedings ISBN 978-625-94054-5-2
- Document language
- Turkish
- Source type
- Industry body
- Access
- Free to read
- Licence
- Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note
Official publisher or university publicly accessible text; no open redistribution licence established. December 2025 publication verified on copyright page. ASHRAE-derived content and secondary global quantities are not summarised.
Citation
Mutlu Bektaş (2025). Dijital Dönüşümün Enerji Bedeli: Türkiye Veri Merkezlerinin Gelecekteki Enerji Talebi. Türkiye Elektrik Sanayi Birliği (TESAB) / CIGRE Türkiye. IV. Güç Sistemleri Konferansı, paper 177; proceedings ISBN 978-625-94054-5-2. https://cigregsk.com.tr/wp-content/uploads/2025/12/IV.-Guc-Sistemleri-Konferansi-Bildiri-e-KitabiSon.pdf
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.