Sustainability Benefits of Prefabricated Data Centers: Core and Shell Carbon Reduction
Schneider Electric · Suraj Manohar Desai, Mahesha Munanjanappa et al.
A Schneider Electric white paper comparing the construction-phase (core and shell) embodied carbon of a traditional stick-built electrical room with an equivalent set of prefabricated power modules.
On this page
Overview
The paper concentrates on a narrow, measurable question: for the same electrical capacity, does an electrical room built on site or a set of prefabricated power modules made in a factory and shipped produce less carbon? The comparison covers only construction-phase (core and shell) embodied carbon; operating energy is outside the evaluation. Four emission sources are counted: above-ground site clearing, freight, on-site construction activity and materials.
The main result is that prefabricated power modules cut core-and-shell construction carbon by about 80% at deployment compared with a stick-built electrical room, which corresponds to an embodied-carbon multiplier of roughly 0.2 for the modular option. The paper also tests whether the advantage fades: even if module enclosures are replaced every 20 years, cumulative embodied carbon stays more than 50% lower after 60 years.
This shows that the modular route carries an end-of-life replacement burden, but that burden does not erase the saving at deployment. The limit is scope: only the electrical room is compared, so nothing is concluded for the whole building or for cooling infrastructure. The authors present prefabrication as a carbon-reduction lever; cost, schedule and operating-performance comparisons are not what this paper is about.
Key points
- Prefabricated power modules cut core-and-shell construction carbon by about 80% at deployment.
- With enclosures replaced every 20 years, cumulative embodied carbon stays more than 50% lower after 60 years.
- Four emission sources: above-ground site clearing, freight, on-site construction and materials.
- The comparison is a stick-built electrical room against equivalent prefabricated power modules.
- Scope is construction-phase embodied carbon only.
Using it in design
- Add a construction-method option for electrical rooms: stick-built or prefabricated module.
- Use an embodied-carbon multiplier of about 0.2 for the prefabricated option at deployment.
- Default the enclosure service life to 20 years and include replacement within a 60-year horizon in lifecycle carbon calculations.
- Show the cumulative curves of the two methods side by side in the carbon report.
Who should read it
Project managers choosing an electrical-room construction method and sustainability engineers computing embodied carbon.
Related standards
- EN 15978
- ISO 21930
Publication details
- Authors
- Suraj Manohar Desai; Mahesha Munanjanappa; Wendy Torell; Ray Lizotte
- Publisher
- Schneider Electric
- Year
- 2026
- Document number
- WP 240
- Document language
- English
- Source type
- Manufacturer
- Access
- Free to read
- Licence
- Copyright retained; citation only: the publisher’s terms apply to the original document
Citation
Suraj Manohar Desai; Mahesha Munanjanappa; Wendy Torell; Ray Lizotte (2026). Sustainability Benefits of Prefabricated Data Centers: Core and Shell Carbon Reduction. Schneider Electric. WP 240. https://download.schneider-electric.com/files?p_Doc_Ref=SPD_WP240_EN