Practical Guide to Preparing Edge Sites and Installing Micro Data Centers
Schneider Electric, 2020, Vendor publication
A Schneider Electric white paper (WP 288, 2020) giving a site-survey, power, cooling, network and start-up checklist for small server rooms and branch-office edge sites up to about 10 kW of IT load.
Vendor publication
2020