Technical guideFree to read2025

Emergency Generator Set Start Signal Integrity

Cummins · Rich Scroggins, Ravi Thapa

Cummins white paper 5544387 (2025): under NEC 700.10(D)(3) the remote start wiring between the transfer equipment and the generator is monitored for broken, disconnected or shorted wires, and loss of integrity starts the generator.

On this page

Overview

The white paper explains the emergency generator start-control wiring requirement introduced in NEC 2017 and later amended, and the wiring that meets it. The engine is started by a remote start contact at the transfer equipment; earlier code editions generally did not require monitoring of that connection. If the start circuit is broken, disconnected or shorted, nothing indicated it to the operator, so power supply could fail on a normal source failure.

NEC 700.10(D)(3) requires control conductors to be entirely independent of all other wiring and to meet 700.10(D)(1). The 2017 text required continuous monitoring and visual and audible annunciation at local and remote annunciators. A Tentative Interim Amendment issued by the Standards Council on 14 August 2018, effective 3 September 2018, led to 2020 language that drops continuous monitoring and annunciation, and requires monitoring for broken, disconnected or shorted wires and starting the generator on loss of integrity. The same requirement applies to fire pumps in 695.14(F).

The paper details one of two methods, integrity contacts (Aux 'A' and Aux 'B'). Normally the two contacts are in opposite states; identical states indicate a fault. For a single transfer equipment it tabulates normal operation, a disconnected start signal (in normal operation and during an outage) and a shorted start signal, and in each fault case the generator either runs on an integrity failure or starts on an outage. For multiple transfer equipments it gives series and parallel wiring rules and a fault table.

Key points

  1. A broken, disconnected or shorted start circuit is a loss of integrity and must start the generator.
  2. NEC 700.10(D)(3) requires control conductors to be entirely independent of all other wiring.
  3. The TIA was issued by the Standards Council on 14 August 2018 and took effect on 3 September 2018.
  4. The 2020 language removes the 2017 continuous-monitoring and visual/audible annunciation requirement; it monitors only for broken, disconnected or shorted wires and starts the generator on loss of integrity.
  5. Methods: integrity contacts (Aux 'A' and 'B') or a monitored network start signal.
  6. Aux 'A' is normally open and Aux 'B' normally closed; opposite states are normal, identical states are a fault.
  7. The same requirement applies to fire pumps under 695.14(F).
  8. With multiple transfer equipments, normally open start contacts are wired in parallel and normally closed integrity contacts in series.

Using it in design

  • Specify a two-wire monitoring circuit with A/B integrity contacts on the remote start line between generator and ATS.
  • Route start control wiring in its own raceway, independent of other circuits.
  • At commissioning, deliberately open and short the start line to confirm the generator runs on an integrity failure.
  • For systems with multiple ATSs, verify the series and parallel contact wiring rules on the single-line and control schematic.
  • Apply the same monitoring requirement separately to fire pump systems.

Who should read it

Engineers and electrical contractors who design, install and commission emergency generator and transfer switch wiring on NEC-referenced projects.

Document contents

  1. Introduction
  2. New NEC 2017 Article 700.10(D)(3) requirements
  3. 2020 code language and TIA
  4. Integrity contact monitoring with a single transfer equipment
  5. Disconnected start signal
  6. Shorted start signal
  7. Integrity monitoring with multiple transfer equipments

Related standards

  • NFPA 70 (NEC)

Publication details

Authors
Rich Scroggins; Ravi Thapa
Publisher
Cummins
Year
2025
Document number
Bulletin 5544387, Rev. 2/25
Document language
English
Source type
Manufacturer
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

Cummins official white-paper landing page opened via TinyFish; official PDF opened via web tool. PDF p. 12 states ©2025 Cummins Inc. and Rev. 2/25. No open licence; metadata only. Official publisher listing and 12-page PDF both opened. No PDF retained locally. License evidence: https://www.cummins.com/en-na/generators/white-papers

Citation

Rich Scroggins; Ravi Thapa (2025). Emergency Generator Set Start Signal Integrity. Cummins. Bulletin 5544387, Rev. 2/25. https://mart.cummins.com/imagelibrary/data/assetfiles/0058610.pdf

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Power design in SoSo CAD

Calculate supply paths, equipment loads and UPS failure scenarios as part of the design.

Single-line diagram in the SoSo CAD power and capacity workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.