Establishing the Sequence of Operation for Paralleling Switchgear

Rehlko · Mike Pincus (Rehlko)

A Rehlko G26-22 white paper describing the four design stages of a paralleling switchgear project and arguing for chart-based sequences that show events, timers, breaker states and failure branches step by step.

On this page

Overview

Rehlko's 2025 white paper G26-22 defines the four design stages of a paralleling switchgear project: single line, sequence of operation, controls and switchgear structure. The sequence of operation is presented as the single most important step and must cover both normal operation and the response to failures such as a breaker failing to open or close.

Rather than a narrative sequence, the paper favours chart-based sequences that show events, timers, breaker states and failure branches step by step. A worked dual-utility, two-generator example covers loss of utility, first-on logic, load shedding, generator management and open versus closed-transition return.

In the example, utility failure timers run, utility breakers open, all generators start, the first generator reaching about 90% of rated voltage and frequency closes to the bus, the others synchronise, and generator mains close bus by bus with stabilisation timers. The chart-based sequences double as submittal, factory and site test procedure, and O&M documentation.

Key points

  1. Four design stages: single line, sequence of operation, controls, switchgear structure.
  2. The sequence of operation is the most important step in paralleling switchgear design and must cover failure cases.
  3. First-on logic: the first generator reaching about 90% of rated voltage and frequency closes to the bus, the others synchronise.
  4. Return to utility is open transition (breakers open, delay, utility closes) or closed transition (sync, close, soft-ramp unload, open at unloaded point).
  5. Chart-based sequences serve as submittal, factory and site test procedure, and O&M documentation.

Using it in design

  • Include a chart-based sequence of operation in the paralleling switchgear specification and verify it covers failure branches (breaker fails to open or close).
  • Define load-shed and load-add logic together with stabilisation timers.
  • Choose open or closed transition return according to the facility's interruption tolerance.
  • Reuse the flow chart as the factory acceptance test and commissioning test script.

Who should read it

Engineers who design, specify and commission paralleling generator switchgear.

Related standards

  • NFPA 110
  • NFPA 70 (NEC) 700

Publication details

Authors
Mike Pincus (Rehlko)
Publisher
Rehlko
Year
2025
Document number
G26-22
Document language
English
Source type
Manufacturer
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

Vendor white paper; no open licence. Year from PDF metadata (Jan 2025).

Citation

Mike Pincus (Rehlko) (2025). Establishing the Sequence of Operation for Paralleling Switchgear. Rehlko. G26-22. https://techcomm.rehlko.com/techcomm/contentful/Rehlko_G26-22_Establishing%20the%20Sequence%20of%20Operation%20for%20Paralleling%20Switchgear.pdf

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Power design in SoSo CAD

Calculate supply paths, equipment loads and UPS failure scenarios as part of the design.

Single-line diagram in the SoSo CAD power and capacity workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.