Guide to Data Center Monitoring

Packet Power

Packet Power's guide covers data-centre power and environmental monitoring: wired versus wireless monitors, two data points for PUE, and ASHRAE's 18-27 °C recommended rack inlet range.

On this page

Overview

The guide is a practical primer for operators starting power and environmental monitoring. Its premise is that power can represent up to 70% of a data centre's operating cost and that 98% of managers say one hour of downtime costs over $100,000. Monitoring is presented as the way to manage both risks, for efficiency and for continuity.

The first section gives eight starting principles: choose a solution that scales, focus first on about 20% of systems, keep information easy to act on and value information over hardware. Monitoring goals follow. PUE needs only two data points: total facility energy and IT equipment energy. Monitoring points for hot spots, circuit utilisation, cooling optimisation and cost allocation are described in turn.

The power monitoring section covers load balance at cabinet and branch-circuit level, phase imbalance on three-phase circuits, use of UPS and PDU capacity and backup power adequacy. The environmental section covers temperature, humidity, dew point and differential pressure, quoting ASHRAE's recommended rack inlet range of 18-27 °C and allowable range of 15-32 °C.

The guide also compares wired and wireless monitors on security, cost, flexibility and reliability, stresses that a remote monitoring system should be independent of the infrastructure it monitors, and explains that retrofit planning starts and ends with data collection. The text is a vendor source and also presents the publisher's own products.

Key points

  1. Power can represent up to 70% of total data-centre operating cost.
  2. 98% of managers say one hour of downtime costs over $100,000, and the largest facilities report $1-5 million.
  3. Measuring PUE needs two data points: total facility energy and IT equipment energy.
  4. One of eight starting principles: about 80% of the value comes from paying attention to 20% of systems.
  5. ASHRAE's recommended rack inlet range is quoted as 18-27 °C and allowable range as 15-32 °C; the lower dew point limit is 5.5 °C.
  6. Raising the cooling temperature by one degree can affect energy cost by 3-5%.
  7. Unequal phase loading on three-phase branch circuits wastes energy and risks tripping a breaker on a rack PDU.
  8. Wireless monitors are often battery-powered, and the batteries typically need replacing after 4+ years.
  9. A monitoring system must be independent of the infrastructure it monitors, and its failure must never jeopardise it; the monitoring network can run isolated from critical control networks.
  10. In retrofits, energy use is compared before and after equipment replacement to evaluate the change.

Using it in design

  • In a new hall, define metering points across the main feed, UPS, PDU, cabinet and branch-circuit hierarchy, plus facility and IT total points for PUE, at design stage.
  • Prepare a sensor placement plan with multi-point rack inlet temperature (within and between racks), row ends and CRAH vicinity, using the ASHRAE recommended range as the alarm threshold.
  • Build a selection matrix for wired versus wireless monitors on installation cost, cabling constraints and network separation, and keep the monitoring network apart from the core data network.
  • Define a capacity report with phase-level current monitoring and load balancing for three-phase branch circuits.
  • In existing facility retrofits, add a measurement plan that measures before and after equipment change to verify the saving.

Who should read it

Data-centre operators, facility managers and electrical and mechanical engineers setting up monitoring.

Document contents

  1. Data center monitoring best practices
  2. Wired vs. wireless monitors
  3. Power monitoring
  4. Environmental monitoring
  5. Monitoring software
  6. Data center retrofitting
  7. Power and electricity fundamentals

Publication details

Authors
Packet Power
Publisher
Packet Power
Year
Year not stated
Document language
English
Source type
Manufacturer
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

Official public manufacturer source inspected. No redistribution permission established. Metadata and original brief summaries only; local files are research evidence, not a redistribution package.

Citation

Packet Power Guide to Data Center Monitoring. Packet Power. https://www.packetpower.com/guide-to-data-center-monitoring

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Cost studies in SoSo CAD

Calculate equipment cost, energy cost and total cost of ownership (TCO) from the design’s quantities and your own price assumptions.

CAPEX and TCO estimates in the SoSo CAD cost workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.