A Panduit white paper (January 2013) showing that in a 45.9 kW lab test cold aisle containment extended the time for IT inlet temperature to reach 95 °F after cooling failure from 4 minutes to about 19 minutes.

On this page

Overview

The paper starts from Ponemon Institute's 2010 national outage survey: 95% of 453 operators had an unplanned outage in two years, with an average of 2.48 complete shutdowns and 107 minutes per event; CRAC failure is among the top root causes. IT on UPS keeps running while cooling is on generator power, generators typically come online in 10 to 20 seconds, but a mechanical cooling failure can take several minutes to recover, so the key question is the time before IT shuts down from overheating (ride-through time).

The common perception is that contained cold aisles give short ride-through because IT draws from a small volume. Panduit's experiments show the opposite. The test bed has a 20-ton CRAC unit (9,000 cfm), eight cabinets in two rows and ten 9 RU load banks, each channel giving 4.17 kW and about 475 cfm. Ten tests were run: an open baseline and nine CAC tests at 62.6, 45.9 and 16.7 kW with return set points of 75, 80 and 95 °F. Ride-through is the time for maximum cabinet inlet temperature to reach 95 °F after the CRAC is switched off.

At 45.9 kW and an 80 °F return set point, the open layout's maximum inlet reached 95 °F in only 4 minutes and the room average reached about 105 °F in 9 minutes. With CAC it took about 19 minutes. The authors give two reasons: the plenum acts as a cold air reservoir that IT can draw through the CRAC, and the thermal mass of the CRAC components (coil, fluid, blowers, compressors) stores cold. Without containment the load banks pull air from the room, the path of least resistance, and no air comes out of the tiles.

Higher IT load and higher return set point shorten ride-through; initial room temperature and load strongly determine the time. The conclusion is that a well-sealed CAC gives about five times longer ride-through for IT than no containment in the tested scenario. The paper also compares a thermodynamic analytical tool and a transient CFD model against the test. It is a vendor publication based on one lab setup.

Key points

  1. Ponemon 2010: 95% of 453 operators had an unplanned outage; average 2.48 full shutdowns, 107 minutes per event.
  2. Generators typically come online in 10 to 20 seconds; recovery from a mechanical cooling failure can take several minutes.
  3. Test: 20-ton CRAC (9,000 cfm), eight cabinets, ten 9 RU load banks; 4.17 kW and about 475 cfm per channel.
  4. Ten tests: open baseline and nine CAC tests at 62.6, 45.9 and 16.7 kW with 75, 80 and 95 °F return set points.
  5. Ride-through is the time for maximum cabinet inlet to reach 95 °F after the CRAC is turned off.
  6. At 45.9 kW and 80 °F: 4 minutes without containment (room average about 105 °F at 9 minutes); about 19 minutes with CAC.
  7. With CAC, normal operation had 55 °F supply and 61 °F average cabinet inlet.
  8. Ride-through shortens with higher IT load and return set point; sealed CAC gave about five times longer ride-through in the tested scenario.

Using it in design

  • Calculate or test ride-through time for the cooling failure scenario against load, initial room temperature and return set point; note that raising the set point shortens the time.
  • In contained rooms verify that during a failure IT can draw air from the plenum and through the cooling unit, so unit and tile paths allow flow.
  • In UPS and generator cooling continuity design treat the 10 to 20 second generator start and the multi-minute mechanical recovery as separate scenarios.
  • Verify good sealing of the containment at acceptance testing, since the advantage is described for a sealed system.
  • Set maximum inlet temperature alarm thresholds for critical IT load consistent with ride-through time.

Who should read it

Engineers and operations teams designing cooling continuity and failure scenarios for cold-aisle-contained rooms.

Document contents

  1. Introduction
  2. Thermal Test Lab Setup
  3. Load Bank Details
  4. Sensors
  5. Testing Details and Test Procedure
  6. Results and Discussion
  7. Conclusion

Related standards

  • ASHRAE TC 9.9 thermal guidelines

Publication details

Authors
Panduit Corp.
Publisher
Panduit
Year
2013
Document language
English
Source type
Manufacturer
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

©2013 Panduit Corp. All rights reserved; copy hosted by distributor (Sonepar)

Citation

Panduit Corp. (2013). Benefits of Cold Aisle Containment During Cooling Failure. Panduit. https://res.cloudinary.com/sonepar-fr/raw/upload/s--TYMhQmLb--/v1/documents/156/98828886.pdf

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Cooling capacity in SoSo CAD

Check zone heat loads, installed capacity and the capacity left with the largest unit out, as part of the design.

Zone heat loads and capacity balance in the SoSo CAD cooling workspace