A white paper from Raritan, prepared with the consulting firm PTS and issued in a 2016 edition, that compares device-level measured power in a working server room with nameplate ratings. Measured consumption ranged from 20% to 85% of nameplate, averaging about 31%, and the room's PUE was calculated as 1.4.

On this page

Overview

This is the first paper in a series of tests in which Raritan and PTS examined heat, airflow and power usage in a live server environment. Its starting point is that capacity planning based on summed server nameplate ratings, or on nameplate ratings derated by a fixed percentage, is no longer adequate. The derated figure, which PTS calls the design rating, is typically 50% to 75% of nameplate and is used to size all power protection, distribution and cooling systems. The paper tests by measurement how well that assumption matches actual consumption.

The instrumentation has three layers. A Veris H8820 data acquisition device measured branch-circuit current for the non-IT loads: computer room air conditioning (CRAC) units, lighting, UPS and others. Geist Racsense monitors were installed with temperature probes at the top and bottom of each rack, front and back, and at the supply and return of each CRAC unit. Two Dominion PX intelligent PDUs in each rack captured the active power of the critical IT load per device. The work ran over five months, and the histogram data come from readings taken between 21 and 26 February 2008.

The central finding is the wide spread of actual consumption relative to nameplate. By average active power, 29 devices used 21% to 40% of nameplate capacity, 15 used more and 15 used less. By maximum power the split was 27, 23 and 9 devices. Two devices ran at 80% to 100% of nameplate, while 44 devices drew power equivalent to an idle server. With that spread, a single derating factor either leaves efficiency unused or puts reliability at risk.

PUE was calculated from the same measurements: support infrastructure 5.625 kW, critical load 13.68 kW, total 19.3 kW, giving 1.4. About 71% of the energy went to the critical IT load (49.4% to servers alone) and 29% to support systems such as cooling and lighting. The paper sets this against estimates that put the IT share at 30% (APC-MGE) and 50% (EYP), and notes PTS's preliminary view that many data centres may have a PUE of 3.0 or more while 1.6 should be achievable with proper design.

The paper is a vendor publication and promotes the use of intelligent rack PDUs. Its data come from one small server room in 2008, and the rack density figures it cites (2.1 kW per rack in 1992, 14 kW per rack in 2006) and the industry averages belong to the same period. The numbers should therefore be read as a historical illustration of the gap between nameplate and measured consumption, not as direct design inputs for current hardware. The method, planning from measurements at branch-circuit, rack and device level, remains valid.

Key points

  1. Measured server consumption ranged from 20% to 85% of nameplate rating and averaged about 31%.
  2. PTS's design rating is typically 50% to 75% of nameplate; the industry derating figure is quoted as 60% to 80%.
  3. The calculated PUE is 1.4: support infrastructure 5.625 kW, critical load 13.68 kW, total 19.3 kW.
  4. 71% of total power went to the critical IT load (49.4% to servers) and 29% to support systems.
  5. By average active power, 29 devices sat in the 21% to 40% band of nameplate capacity; two devices ran in the 80% to 100% band.
  6. 44 devices drew idle-server-level power; at an assumed 10 to 1 consolidation, about 40 could be decommissioned.
  7. Density data cited: 2.1 kW per rack in 1992 and 14 kW per rack in 2006 (HP); a 2007 US survey average of 5.5 kW per rack and an average maximum of 11.6 kW per rack.
  8. PTS's preliminary work indicates that many data centres have a PUE of 3.0 or greater, with 1.6 considered achievable through proper design.
  9. A sudden drop in measured energy use revealed that the breaker on one CRAC unit had tripped.

Using it in design

  • Do not derive rack power in a new design from summed nameplate ratings; where possible use measured data from comparable hardware or the manufacturer's configuration-specific power calculator.
  • When applying a single derating factor, treat the highest consumers separately; two devices in the measurement ran at 80% to 100% of nameplate.
  • Define the metering points needed for PUE reporting at design stage: branch-circuit monitoring for non-IT loads and active power metering at rack PDU level for the IT load.
  • Set branch-circuit monitoring thresholds so that an alert is raised before the load reaches the breaker rating.
  • Do not use the 2008 density and PUE figures here as benchmarks for a current project; treat them only as an example of the measurement method.

Who should read it

Data-centre managers doing capacity planning, electrical engineers designing rack power distribution and metering, and teams reporting energy efficiency.

Document contents

  1. About This Series
  2. Overview
  3. The Challenge
  4. Nameplate Ratings and Assumptions
  5. IT Equipment Power Load vs. Total Facility Power Load
  6. Measurement Systems
  7. The Green Grid: Calculating PUE
  8. Tools to Calculate PUE
  9. The Results: Nameplate Vs. Actual Power Draw, Calculating Raritan’s PUE
  10. Conclusions
  11. What’s Next?

Publication details

Authors
Raritan
Publisher
Raritan
Year
2016
Document language
English
Source type
Manufacturer
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

Publisher source opened. No document-specific commercial redistribution permission established; link and original metadata only.

Citation

Raritan (2016). Data Center Power Distribution and Capacity Planning: Understanding Power Usage in Your Data Center. Raritan. https://raritan.com/assets/ram/resources/white_papers/raritan-wp-Data-Center-Power-Distribution-and-Capacity-Planning.pdf

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Power design in SoSo CAD

Calculate supply paths, equipment loads and UPS failure scenarios as part of the design.

Single-line diagram in the SoSo CAD power and capacity workspace