Rehlko · Fuad Ahmed (Rehlko), Alain deLeon (Rehlko)
A Rehlko G26-24 application note: a six-pulse UPS with 28.9% ITHD can produce 15.4% VTHD even with linear load at only 50% of alternator capacity; the remedy is to cut harmonics at the load first.
On this page
Overview
Rehlko's 2025 application note G26-24 covers harmonic distortion from UPS rectifiers, VFDs, chargers and other non-linear loads fed by standby generators. Effects include voltage notching, false zero crossings, neutral overheating and paralleling problems.
Example: a six-pulse UPS with 28.9% ITHD can produce 15.4% VTHD even when the linear load is only 50% of alternator capacity, while a small LED ballast at 167% ITHD gives only 3.1% VTHD. Sub-transient reactance (Xd'') governs the generator's response to harmonic currents; a lower Xd'' reduces voltage distortion.
Distorted voltage waveforms can prevent smooth automatic paralleling and increase neutral current in balanced three-phase systems. The recommended order is to reduce harmonics at the load first (filters, 12/18-pulse or low-ITHD equipment) and then size the generator.
Key points
- Example: a six-pulse UPS at 28.9% ITHD can produce 15.4% VTHD (with linear load at 50% of alternator capacity).
- A small LED ballast at 167% ITHD gives only 3.1% VTHD; ITHD alone does not set the distortion, load power matters too.
- Sub-transient reactance Xd'' governs the generator's response to harmonic currents; low Xd'' reduces voltage distortion.
- Distorted voltage hampers automatic paralleling and increases neutral current in balanced three-phase systems.
- Effects: voltage notching, false zero crossings, neutral overheating, paralleling problems.
- Mitigations: alternator oversizing, low Xd'', passive/active filters, low-ITHD equipment.
Using it in design
- Collect UPS and drive ITHD values before sizing the generator and check VTHD against the alternator Xd''.
- Write the load-side reduction strategy (12/18-pulse rectifier, active filter, low ITHD) into the specification before sizing the generator.
- Request a low-Xd'' or oversized alternator option as a separate line in the quotation.
- Verify synchronisation behaviour under distorted voltage in factory and site tests of paralleled generator systems.
Who should read it
Electrical engineers sizing UPS-loaded generator systems, and commissioning teams.
Related standards
- IEEE 519
- ISO 8528-3
Publication details
- Authors
- Fuad Ahmed (Rehlko); Alain deLeon (Rehlko)
- Publisher
- Rehlko
- Year
- 2025
- Document number
- G26-24
- Document language
- English
- Source type
- Manufacturer
- Access
- Free to read
- Licence
- Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note
Vendor white paper; no open licence. Year from PDF metadata (Jun 2025).
Citation
Fuad Ahmed (Rehlko); Alain deLeon (Rehlko) (2025). Managing Non-Linear Loads for Emergency Generators. Rehlko. G26-24. https://techcomm.rehlko.com/techcomm/pdf/Rehlko_G26-24_Managing_Non-Linear_Loads_for_Emergency_Generators.pdf
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.