Types of Prefabricated Modular Data Centers

Schneider Electric · Wendy Torell

This 2017 Schneider Electric white paper classifies factory-built data center modules by three attributes: functional block, form factor and configuration.

On this page

Overview

The functional block is power, cooling or IT space. A power module holds switchgear/switchboards, ATS, UPS with batteries, transformers and panelboards, with standby generators usually a separate module. Cooling module types are chiller plant (air-cooled chiller, pumps/drives, storage tank, dry/evaporative cooler), DX plant, indirect air (air-to-air heat exchanger, evaporative, DX backup) and direct air (filters, evaporative, DX backup).

Form factor is ISO container, non-ISO enclosure or skid. ISO container footprints are 20 x 8 ft (6.10 x 2.44 m) and 40 x 8 ft (12.2 x 2.44 m), at 8 ft 6 in (2.591 m) or high-cube 9 ft 6 in (2.896 m). Practical container capacity is about 500 kW for power or cooling plant and about 200-250 kW for IT space. Skid-mounted modules often cost up to 40% less than equivalent enclosure designs but are generally indoor-only, and are not logical for IT space because they lack air separation.

Configuration is semi-prefabricated, fully prefabricated or micro/all-in-one. An all-in-one (power, cooling, IT) module is limited to about 150 kW in an ISO footprint, and beyond 2 or 3 micro data center modules on a site (about 500 kW) they become cost prohibitive. Walk-in enclosures must provide lighting, fire protection, security and a means of egress.

The paper distinguishes pre-engineered designs (documented and specified) from prefabricated ones (also factory assembled and tested). Use cases include retrofit capacity shortfalls, multi-tenant step-and-repeat growth, and edge or temporary sites.

Key points

  1. Three attributes: functional block, form factor, configuration.
  2. ISO containers are 20 x 8 ft and 40 x 8 ft, 8 ft 6 in or 9 ft 6 in high-cube.
  3. Practical ISO capacity: about 500 kW power/cooling plant, about 200-250 kW IT space.
  4. Skid modules cost up to 40% less than enclosures, are generally indoor-only and unsuited to IT space.
  5. All-in-one modules reach about 150 kW in an ISO footprint; beyond 2-3 units (about 500 kW) per site they are cost prohibitive.
  6. Walk-in enclosures need lighting, fire protection, security and egress.
  7. Pre-engineered means documented; prefabricated also means factory assembled and tested.

Using it in design

  • For module selection, record functional block, form factor, indoor/outdoor rating, walk-in flag, shipping sections, footprint and height.
  • Review ISO power or cooling modules above about 500 kW and IT modules above about 250 kW separately; do not assume a skid is suitable as IT space.
  • Suggest semi- or fully prefabricated options when an all-in-one exceeds 150 kW or 2-3 units per site.
  • Select the prefabricated approach for the use case: a capacity shortfall, multi-tenant operation, or an edge or temporary facility.

Who should read it

Designers choosing among prefabricated module types and their capacity ceilings.

Related standards

  • ISO 668
  • ISO 1496-1
  • UL 2755
  • NFPA 101

Publication details

Authors
Wendy Torell
Publisher
Schneider Electric
Year
2017
Document number
WP 165
Document language
English
Source type
Manufacturer
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document

Citation

Wendy Torell (2017). Types of Prefabricated Modular Data Centers. Schneider Electric. WP 165. https://download.schneider-electric.com/files?p_Doc_Ref=SPD_WTOL-97GLP9_EN

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Power design in SoSo CAD

Calculate supply paths, equipment loads and UPS failure scenarios as part of the design.

Single-line diagram in the SoSo CAD power and capacity workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.