GCC AI & HPC Infrastructure Report: Powering Sovereign Compute: Overcoming Power, Heat, and Water Limits at Scale
Original title GCC AI & HPC Infrastructure Report: Powering Sovereign Compute - Overcoming Power, Heat, and Water Limits at Scale
Submer
A November 2026 Submer report stating that the GCC data centre project pipeline exceeds US$93 billion, capacity is expected to rise from about 1 GW to 3.3 GW by 2030 and AI racks draw 30-150 kW.
On this page
Overview
The report examines the AI- and HPC-oriented data centre infrastructure market (compute, GPU platforms, high-density facilities, power and thermal systems) across the six GCC states, with 2026 as base year and a view to 2030. It separates third-party analyst figures from its own modelling; regional data centre market estimates for 2024-2025 vary from about US$2.4bn to US$3.5bn depending on the analyst's definition.
The core message is that the region is moving from cloud adoption to sovereign AI infrastructure at national scale, and that the bottleneck is no longer capital and chips but power, thermal design and operating capability in 40 °C-plus, water-scarce conditions. The pipeline exceeds US$93 billion across more than 174 projects, and FTI Consulting expects capacity to rise from about 1 GW to 3.3 GW by 2030. A single GB300 NVL72 rack draws about 132-135 kW at rack TDP and up to about 155 kW at peak, and is liquid-cooled by design.
The thermal section says air cooling has reached its practical limit as density moves from 30 kW toward 150 kW. DTC took 42.85% of liquid cooling revenue in 2025 and leads on integration speed; immersion is the fastest-growing segment at a 26.6% CAGR through 2031, supports over 100 kW per rack and can reach PUE 1.02-1.03. Immersion entry CAPEX is roughly 2-3 times the air-cooled baseline; DTC retains air handling for about 10% of load on GB300-class systems.
The water section reports that Saudi data centres reportedly consumed about 15 billion litres in 2024 (analyst estimate), that a 1 GW facility can need 1.5 to 5 million m³ a year and that evaporative cooling can raise this five to ten times. Closed-loop and immersion-based designs can bring direct water consumption to zero; the GCC has no PUE or WUE mandate yet. The report is vendor content and ends with a section on Submer's position.
Key points
- The GCC project pipeline exceeds US$93 billion across 174+ projects (MEED/GlobalData, May 2026).
- Capacity is expected to rise from about 1 GW to 3.3 GW by 2030 (FTI Consulting).
- AI racks draw 30-150 kW; a GB300 NVL72 rack draws about 132-135 kW at rack TDP and about 155 kW at peak.
- DTC took 42.85% of liquid cooling revenue in 2025; immersion is growing at 26.6% CAGR through 2031.
- Immersion supports over 100 kW per rack and can reach PUE 1.02-1.03; entry CAPEX is about 2-3 times air-cooled.
- DTC retains air handling for about 10% of load on GB300-class systems.
- Modelled 2026 market: TAM US$3.0-4.5bn, SAM US$1.1-1.6bn, SOM US$45-110m.
- Saudi data centres consumed about 15 billion litres of water in 2024; a 1 GW facility can need 1.5-5 million m³ a year.
Using it in design
- Do not treat air cooling as sufficient for AI halls above 30 kW per rack; design hybrid mixes of DTC, immersion or RDHx.
- In DTC design, calculate the residual air load (about 10% on GB300-class systems) separately.
- At hot, water-scarce sites, make closed-loop and dry heat rejection the priority option for zero direct water consumption.
- If grid allocation is constrained, include in capacity planning that cutting cooling load increases IT capacity.
- Weigh the 2-3 times CAPEX premium for immersion against lifecycle energy and density gains.
- Read the report's market figures as decision-support ranges, not audited data.
Who should read it
Data centre operators, investors and policymakers planning AI and HPC infrastructure in the GCC and similar hot climates.
Document contents
- Methodology, Scope & Limitations
- Executive Summary
- Market Overview & Sizing
- Industry Trends & Drivers
- Competitive Landscape
- Strategic Opportunities & Risks
- 2026-2030 Future Outlook
- Where Submer Fits
- References
Publication details
- Authors
- Submer
- Publisher
- Submer
- Year
- 2026
- Document language
- English
- Source type
- Manufacturer
- Access
- Free to read
- Licence
- Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note
Vendor report on submer.com; no open licence stated
Citation
Submer (2026). GCC AI & HPC Infrastructure Report: Powering Sovereign Compute - Overcoming Power, Heat, and Water Limits at Scale. Submer. https://submer.com/wp-content/uploads/2026/11/GCC-AI-HPC-Infrastructure-Report.pdf
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.