TANPERA TGT Series Diaphragm Expansion Tank Operation Manual
Original title TGT Serisi Membranlı Genleşme Tankı: Montaj, Bakım ve Kullanma Kılavuzu
Tanpera
The TANPERA TGT diaphragm expansion tank manual gives installation location, connection rules, pre-charge pressure formulas and a twice-yearly service requirement for 24-5000 litre, 10/16 bar tanks.
On this page
Overview
The manual covers installation, commissioning and maintenance of TGT series diaphragm expansion tanks. The tanks balance water volume changes with temperature in heating, cooling, air-conditioning, solar and domestic hot water systems, reduce switching in booster and water supply systems and damp pressure shocks. Use outside these purposes is excluded. The fluid must fall under Group 2 liquids of the Pressure Equipment Directive (2014/68/EU) and its vapour pressure at maximum operating temperature must not exceed atmospheric pressure + 0.5 bar.
Construction: capacity 24-5000 litres, hot water not above 100°C, working pressure 10 or 16 bar (8 bar for 24 and 50 litre tanks), vertical mounting, carbon steel shell, EPDM diaphragm and 4 bar dry-air pre-charge (1.5 bar for 24 and 50 litre tanks). On request: 25 bar, stainless steel, butyl diaphragm or nitrogen charge. In the type code TGT 500/10, 500 is capacity in litres and 10 the maximum working pressure in bar.
The location must be dry, enclosed and frost-free; places below +5°C or above +50°C are outside warranty. The floor must carry the full tank weight and be level, with a base at least 10 cm high recommended; drainage against flooding is required. For connection the manual recommends an approved plant design, a suitable safety valve (set at most 10% below the tank and system pressure rating), an unobstructed valve outlet, a lockable shut-off valve, a drain cock, earthing and a common manifold. In heating the tank connects at the heat source return; above 80°C an intermediate cooling vessel or at least a 2 m inverted siphon is advised; the connecting line is not insulated. Antifreeze must not exceed 50% by volume.
Pre-charge pressure is set before water is admitted: heating, static height/10.2 + about 0.3 bar (at least 0.7 bar); cooling, static height/10.2; domestic hot water, mains pressure (at most 5.5 bar); booster systems, pump cut-in pressure x 0.9. Flammable gas is never used. Inspection and maintenance are done at least twice a year, with the tank empty and below 40°C; pressure is never adjusted on a damaged or corroded tank because of explosion risk.
Key points
- Capacity 24-5000 litres; working pressure 10 or 16 bar (8 bar for 24 and 50 litres).
- Carbon steel shell, EPDM diaphragm, 4 bar dry-air pre-charge (1.5 bar for 24 and 50 litres).
- Fluid is hot water up to 100°C; vapour pressure must not exceed atmospheric + 0.5 bar.
- Installation environment must be +5 to +50°C, dry and frost-free.
- Safety valve set pressure must be at most 10% below tank and system pressure rating.
- Heating pre-charge = static height/10.2 + about 0.3 bar, minimum 0.7 bar.
- Cooling pre-charge equals static height/10.2.
- Antifreeze volume fraction must not exceed 50%.
- Above 80°C an intermediate cooling vessel or at least a 2 m inverted siphon is advised.
- Service at least twice a year; check pre-charge with tank empty and below 40°C.
Using it in design
- In chilled water and glycol circuits set pre-charge equal to static height/10.2 and connect the tank on the pump suction side.
- Fit a lockable shut-off valve and drain cock on the tank line; a forgotten closed valve disables the tank and the safety valve discharges water.
- Set the safety valve at most 10% below the tank and system pressure rating and direct its outlet to a drain.
- Keep glycol below 50% and make the fill connection elsewhere in the system, not on the tank line.
- For several tanks use the same level, a common manifold and equal pre-charge; plan a gas-pressure check twice a year.
Who should read it
Mechanical designers and facility engineers who select, install and maintain diaphragm expansion tanks on heating, cooling and booster circuits.
Document contents
- Foreword
- Introduction
- Safety warnings
- General (product identification, correct operation, warnings)
- Device construction
- Installation (location, required space, handling, connection to system)
- Commissioning (pre-checks, setting pre-charge pressure)
- Inspection and maintenance
- Troubleshooting
- After-sales service and warranty
Publication details
- Authors
- Tanpera
- Publisher
- Tanpera
- Year
- Year not stated
- Document number
- TMK-02-2019/1
- Document language
- Turkish
- Source type
- Manufacturer
- Access
- Free to read
- Licence
- Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note
Official publisher material inspected. No document-specific commercial redistribution permission established; retain metadata and original short summaries only.
Citation
Tanpera TGT Serisi Membranlı Genleşme Tankı: Montaj, Bakım ve Kullanma Kılavuzu. Tanpera. TMK-02-2019/1. https://www.tanpera.com.tr/wp-content/uploads/2025/05/TGT_Serisi_Genlesme_Tanklari_Kullanim_Klavuzu_TR_V0.pdf