Technical guideFree to read2021

VESDA Datacom Case Study: Generator Capacitor

Original title VESDA: You will never have to worry about smoke going unnoticed in your datacom facility (case study)

Xtralis / Honeywell · Xtralis (Honeywell)

Xtralis datacom brochure of December 2021: at a large facility VESDA flagged a failing capacitor on an emergency generator before it became a fire; the document cites an FCC estimate of over US $2 million per hour of downtime.

On this page

Overview

The document is a short manufacturer brochure for data centres and telecommunications facilities (datacom) built around one case: at a large datacom facility the VESDA system alerted staff that a capacitor on an emergency generator was having electrical problems, the source was found and a fire was prevented. The case is given as a quote from an engineer at Cromwell Architects Engineers. The document contains no independent test or measurement and rests on user statements and agency data.

The risk narrative relies on US Federal Communications Commission (FCC) data: downtime costs upwards of US $2 million per hour in a large facility; the most common instigator of fires in telecommunication facilities is building systems, especially power distribution equipment; and 95% of fire damage in facilities housing electronic equipment is corrosion. The document says air conditioning disrupts smoke dispersion, smoke dilutes in high-airflow areas delaying point detectors, and HVAC filtration removes smoke particles, delaying detection.

The design advice is to place sampling points near the likeliest sources of electrical fire and along the smoke path carried by air conditioning: across the return-air vent, under the restricted area of the raised floor and near high-risk cabling, inside equipment cabinets via capillary tubes, and across the fresh air make-up vent. The document stresses that all designs be tested against the VESDA Design Guide and local codes and lists NFPA 75, NFPA 76, TIA-942, FFIEC, BS 6266 and the BFPSA code of practice as complied standards.

Key points

  1. FCC estimate: downtime in a large datacom facility costs upwards of US $2 million per hour.
  2. According to the FCC, building systems, especially power distribution equipment, are the most common instigator of fires in telecommunication facilities.
  3. According to the FCC, 95% of fire damage in facilities housing electronic equipment is corrosion (chloride and sulfur from smoke react with humidity).
  4. Case: a failing capacitor on an emergency generator was caught by VESDA and a fire was prevented.
  5. Detection challenges: air-conditioning airflow draws smoke away, smoke dilutes in high airflow, HVAC filters remove smoke particles.
  6. Suggested sampling: across the return-air vent, under the raised floor, near high-risk cabling, capillary tubes in cabinets, across the fresh air make-up vent.
  7. In small facilities one detector can protect the ceiling, return air vent and underfloor together.
  8. All designs should be tested against VESDA Design Guide recommendations and local codes.
  9. Standards listed: NFPA 75, NFPA 76, TIA-942, FFIEC, BS 6266 (2002) and the BFPSA code of practice.

Using it in design

  • Treat generator and power distribution rooms as the building systems the FCC data single out as fire instigators; add sampling points there.
  • Define separate sampling points for the return-air vent, underfloor space and inside cabinets.
  • Match the detection design to NFPA 75, NFPA 76 and TIA-942 requirements and verify it with smoke tests at acceptance.
  • Include smoke-borne corrosion risk in zoning decisions, noting that redundant systems sharing air conditioning can be contaminated.
  • In the downtime cost case (the US $2 million per hour scale), document the justification for early-detection investment numerically.

Who should read it

Engineers designing fire detection for data-centre and telecommunications facilities, and facility managers.

Document contents

  1. What are the consequences of fire
  2. What are the risks
  3. Unique detection challenges
  4. Protecting a datacom facility from fire (sampling layout)
  5. Complied standards and approvals

Related standards

  • EN 54-20
  • NFPA 72
  • NFPA 75

Publication details

Authors
Xtralis (Honeywell)
Publisher
Xtralis / Honeywell
Year
2021
Document number
13328_07
Document language
English
Source type
Manufacturer
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

Vendor case study; no open licence stated

Citation

Xtralis (Honeywell) (2021). VESDA: You will never have to worry about smoke going unnoticed in your datacom facility (case study). Xtralis / Honeywell. 13328_07. https://xtralis.com/file/6842

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Standards pre-assessment in SoSo CAD

Run TS EN 50600 and Tier pre-checks on the model, with missing inputs and items for engineering review listed separately.

Selected rule packs and findings in the SoSo CAD standards panel

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.