Technical guideFree to readYear not stated

Turk Telekom Internet Data Center, Istanbul

Original title Türk Telekom İnternet Veri Merkezi, İstanbul

EEC Entegre Bina Kontrol Sistemleri

An EEC case study of the Gayrettepe Turk Telekom internet data centre: an integrated Edwards and Xtralis (VESDA) system with aspirating smoke detection at three primary points and ceiling-level secondary detection.

On this page

Overview

The page is a short integrator case study describing the fire alarm system EEC installed for the Turk Telekom internet data centre in its Gayrettepe building in Istanbul. As Turk Telekom's fire alarm solution partner, EEC has installed turnkey Edwards systems in over 100 facilities and linked them to graphic management centres in each provincial headquarters. The same firm also supplies IP CCTV and access control.

The technical approach places detection according to airflow in the room. The fire alarm is integrated with Edwards and Xtralis (VESDA) products, with highly sensitive aspirating smoke detectors used alongside point detectors and other field devices, and the whole system can be monitored from several points.

Primary detection is at three points: where air leaves electronic equipment cabinets, in front of the air-handling-unit (AHU) intake grilles, and in the raised-floor volume where cooled AHU air is supplied. Secondary detection at ceiling level covers smoke behaviour when ventilation is partly or fully unavailable. The page is a reference showcase and gives no sensitivity settings, alarm thresholds or measured performance.

Key points

  1. EEC has installed Edwards fire alarm systems in over 100 Turk Telekom facilities, connected to graphic management centres in provincial headquarters.
  2. At the Gayrettepe data centre the fire alarm is integrated with Edwards and Xtralis (VESDA) products.
  3. Highly sensitive aspirating detectors are combined with point detectors and other field devices, and monitoring is available from multiple points.
  4. One primary detection location is where air leaves electronic equipment cabinets.
  5. The second is in front of the AHU intake grilles and the third the raised-floor volume receiving cooled air.
  6. Secondary detection sits at ceiling level for cases when ventilation is partly or fully unavailable.

Using it in design

  • Plan aspirating sampling points where airflow naturally gathers smoke, such as rack exhaust, AHU return intake and under the raised floor.
  • Design ceiling-level secondary detection separately for the ventilation-off scenario.
  • Combine sensitive aspirating detection with point detectors and provide multi-point monitoring from the fire panel.
  • For operators with many sites, specify connectivity to regional graphic monitoring centres.

Who should read it

Electrical and fire safety engineers designing data centre fire detection and facility managers at telecom operators.

Document contents

  1. Turk Telekom Internet Data Center, Istanbul
  2. EEC's role
  3. Technical approach

Publication details

Authors
EEC Entegre Bina Kontrol Sistemleri
Publisher
EEC Entegre Bina Kontrol Sistemleri
Year
Year not stated
Document language
Turkish
Source type
Industry body
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

Official public source inspected. No document-specific redistribution permission established; metadata and original brief summaries only. Local downloads are research evidence, not a redistribution package.

Citation

EEC Entegre Bina Kontrol Sistemleri Türk Telekom İnternet Veri Merkezi, İstanbul. EEC Entegre Bina Kontrol Sistemleri. https://www.eec.com.tr/referanslarimiz/basari-oykuleri/telekom-ve-veri-merkezleri/turk-telekom-internet-veri-merkezi-istanbul

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Standards pre-assessment in SoSo CAD

Run TS EN 50600 and Tier pre-checks on the model, with missing inputs and items for engineering review listed separately.

Selected rule packs and findings in the SoSo CAD standards panel

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.