Dynamic Modelling of Data Center Waste Heat Potential Integration in District Heating in Latvia
Energies (MDPI AG) · Ieva Pakere, Kirils Goncarovs et al.
Riga Technical University researchers surveyed Latvian data-centre operators and estimated how much waste heat each site could supply to district heating through air-to-water heat pumps, then projected national waste-heat uptake to 2050 with a system-dynamics model.
CC BY 4.0 — share with attribution
On this page
Overview
As demand for data centres has increased rapidly, so has their electricity consumption, and most of the electricity consumed, including cooling, is eventually dissipated as heat released to the atmosphere without useful application. The study analyses the existing potential of waste heat recovery from data centres in Latvia and proposes a system-dynamics modelling approach to evaluate the future impact of waste heat on national heat supply. For each site, heat-pump COP, the energy reuse factor (ERF), distance to the nearest district heating (DH) network and simple payback were computed.
For the COP calculation, data-centre outlet (source) temperature was assumed to be around 18.7 °C and the required DH inlet temperature 65 °C, using the Lorenz efficiency method. ERF was computed as recovered waste heat divided by total electricity consumption. Surveyed sites had PUE from 1.24 to 2.27 (average 1.9). National data-centre waste-heat potential was 51.37 GWh/year, which could yield 63.12 GWh of heat with air-to-water heat pumps at COP 4.37. ERF values ranged from 0.40 to 0.69, with the highest ERF at the data centre with the lowest PUE. Distances to DH networks ranged from 3 to 2265 m (average 371.7 m), and heat-pump payback ranged from 6.44 years for the biggest site to 14.98 years for the smallest.
The model was highly sensitive to electricity prices above 260 EUR/MWh, heat-pump operation below 6570 h/year and COP below 4.75. By 2050 the national data-centre heat production potential rises to 257 GWh, of which 201 GWh is utilised.
Limits: the concentration of data centres in the capital limits national-scale waste-heat use, and a regionally decentralised data-centre network is needed for more equal use. Utilisation is highly sensitive to electricity prices and heat-pump COP, so cheaper green electricity and lower DH supply temperatures improve feasibility.
Key points
- For the COP calculation, data-centre outlet (source) temperature was assumed to be around 18.7 °C and the required DH inlet temperature 65 °C, using the Lorenz efficiency method.
- ERF was computed as recovered waste heat divided by total electricity consumption.
- Surveyed sites had PUE from 1.24 to 2.27 (average 1.9); national waste-heat potential was 51.37 GWh/year, yielding 63.12 GWh of heat with air-to-water heat pumps at COP 4.37.
- ERF values ranged from 0.40 to 0.69, with the highest ERF at the data centre with the lowest PUE.
- Distances to DH networks ranged from 3 to 2265 m (average 371.7 m); heat-pump payback ranged from 6.44 years for the biggest site to 14.98 years for the smallest.
- The model was highly sensitive to electricity prices above 260 EUR/MWh, heat-pump operation below 6570 h/year and COP below 4.75.
- By 2050 national data-centre heat production potential rises to 257 GWh, of which 201 GWh is utilised.
Using it in design
- Assess waste-heat sale feasibility with ERF, heat-pump COP (4.37 for 65 °C DH inlet), distance to the DH network (3-2265 m) and payback (6.44-14.98 years) together.
- Test the sensitivity thresholds for electricity price, heat-pump running hours (6570 h/year) and COP (4.75) in the feasibility study.
- Treat lower DH supply temperatures and low PUE (which raises ERF) as positive factors in site selection.
Monthly newsletter · free
Keep your reading list current
Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.
SoSo CAD
Compare the cost of design decisions
Evaluate equipment costs, energy expenses and total cost of ownership (TCO) using your inputs and assumptions in SoSo CAD.
Request a demo
Who should read it
Planners and energy engineers evaluating integration of data-centre waste heat into district heating.
Document contents
- 1. Introduction
- 2. Literature Review (2.1 Data Centers as Heat Energy Producers, 2.2 Evaluation of Heat Production)
- 3. Methodology (3.1 Waste Heat Potential Determination)
- 4. Results
- 5. Discussion and Conclusions
Related standards
- EN 50600-4-6 (ERF)
Read the document
dc-waste-heat-dh-latvia-dynamic-2024.pdf
CC BY 4.0 — share with attribution
The document is provided unaltered because its licence permits redistribution.
Publication details
- Authors
- Ieva Pakere; Kirils Goncarovs; Armands Grāvelsiņš; Marita Agate Zirne
- Publisher
- Energies (MDPI AG)
- Year
- 2024
- Volume
- 17
- Issue
- 2
- Pages
- 445
- Document language
- English
- Source type
- Scientific
- Access
- Open licence — downloadable
- Licence
- CC BY 4.0 — share with attribution
- Licence evidence
- www.mdpi.com
Original licence note
PDF p.1 states the article is open access under the Creative Commons Attribution (CC BY 4.0) licence; MDPI publishes all articles under CC BY 4.0.
Citation
Ieva Pakere; Kirils Goncarovs; Armands Grāvelsiņš; Marita Agate Zirne (2024). Dynamic Modelling of Data Center Waste Heat Potential Integration in District Heating in Latvia. Energies (MDPI AG). 17(2), 445. https://doi.org/10.3390/en17020445
Events on this subject
Browse the events calendarAll content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.