High Performance Computing Data Center Metering Protocol (FEMP, September 2010)

U.S. DOE Federal Energy Management Program / Oak Ridge National Laboratory · Thomas Wenning, Michael MacDonald

A protocol prepared by ORNL for the US DOE FEMP on metering electrical and chilled-water systems in HPC data centres to compute PUE and DCiE.

On this page

Overview

This document is the high performance computing (HPC) data centre metering protocol prepared by Oak Ridge National Laboratory (ORNL) for the US Department of Energy's Federal Energy Management Program (FEMP). It is dated September 2010 and was written by Thomas Wenning and Michael MacDonald under a UT-Battelle contract.

The protocol explains the purposes and levels of metering, metering equipment, an ORNL metering case study, and a protocol for metering electrical and chilled-water systems to compute PUE and DCiE. Four metering levels are defined: site, building, system and end-use, with the classification citing ASTM E1465.

Electric system metering and chilled-water system metering are treated separately in the protocol. The separation reflects the understanding that PUE must rest not only on electricity meters but also on thermal measurements of the cooling plant. The ORNL case study shows how the principles apply in a real facility.

As a limitation, the document dates from 2010 and focuses on HPC facilities; details such as meter classes and measurement accuracy are not covered on this page. Because it was prepared by a national laboratory contractor, it is not treated as public domain.

Key points

  1. Prepared by ORNL for FEMP; dated September 2010.
  2. Authors are Thomas Wenning and Michael MacDonald.
  3. Defines four metering levels: site, building, system and end-use (citing ASTM E1465).
  4. Covers electric system and chilled-water system metering separately.
  5. Includes an Oak Ridge National Laboratory metering case study.
  6. Gives a metering protocol for computing PUE and DCiE.

Using it in design

  • Place metering points in single-line and chilled-water diagrams according to the site, building, system and end-use levels.
  • Let the tool auto-suggest the meters needed for PUE and for chilled-water plant kW per ton.
  • Plan electrical and thermal metering together.

Monthly newsletter · free

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.

SoSo CAD

Compare the cost of design decisions

Evaluate equipment costs, energy expenses and total cost of ownership (TCO) using your inputs and assumptions in SoSo CAD.

Request a demo
CAPEX and TCO estimates in the SoSo CAD cost workspace

Who should read it

Electrical and mechanical engineers and energy managers designing data centre metering and monitoring.

Related standards

  • ASTM E1465

Publication details

Authors
Thomas Wenning; Michael MacDonald
Publisher
U.S. DOE Federal Energy Management Program / Oak Ridge National Laboratory
Year
2010
Document language
English
Source type
Government / public
Access
Free to read
Licence
Copyright retained; citation only — the publisher’s terms apply to the original document
Original licence note

Prepared for DOE FEMP by a national-laboratory contractor (stated on cover); not US-Gov public domain. Cited only.

Citation

Thomas Wenning; Michael MacDonald (2010). High Performance Computing Data Center Metering Protocol (FEMP, September 2010). U.S. DOE Federal Energy Management Program / Oak Ridge National Laboratory. https://www.energy.gov/cmei/femp/articles/high-performance-computing-data-center-metering-protocol

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.