Bending the Energy Curve: Decoupling Digitalization Trends from Data Center Energy Growth
Schneider Electric · Jim Simonelli, Victor Avelar et al.
A Schneider Electric white paper (WP 212, 2025) that explains why global data center electricity is forecast to grow strongly toward 2030 and compares the effect of the PUE lever against ICT efficiency in scenarios.
On this page
Overview
The paper examines why global data center electricity, flat during 2010-2020, is forecast to grow strongly toward 2030. Its analysis rests on the ratio of ICT energy to annual data generated. That ratio points to a compute-efficiency disruption from about 2020, with recovery expected later in the decade. The problem is therefore not only rising demand: energy per unit of data also worsened for a period.
The scenario section compares two levers. Reaching PUE 1.2 for new builds and 1.3 for 10% of existing sites by 2030 cuts data center energy by about 3.6% (about 38 TWh). Improvement in the ICT performance factor cuts energy by about 14.4% (about 153 TWh), roughly four times the PUE lever. The conclusion is that facility efficiency is useful but secondary.
ICT energy per unit of data is about 0.92 TWh/ZB in 2020 and is projected at 0.45 and 0.34 TWh/ZB by 2030 depending on the scenario. The paper also discusses grid-relief measures such as flexible load. These are forecasts, not measurements: results depend on assumed scenarios, so the relative size of the two levers is a safer reading than any single figure.
Key points
- Global data center electricity was flat in 2010-2020 and is forecast to grow strongly toward 2030.
- PUE 1.2 for new builds plus 1.3 for 10% of existing sites by 2030 cuts energy about 3.6% (about 38 TWh).
- ICT performance factor improvement cuts energy about 14.4% (about 153 TWh), roughly 4x the PUE lever.
- ICT energy per data generated was about 0.92 TWh/ZB in 2020.
- Projected 0.45 and 0.34 TWh/ZB by 2030 depending on scenario.
- A compute-efficiency disruption from about 2020 is followed by expected recovery later in the decade.
- Grid-relief measures such as flexible load are discussed.
Using it in design
- In the energy dashboard, show IT-side levers (utilization, accelerated computing) next to facility PUE.
- Add context text telling users that PUE improvement can be a small share of total energy impact.
- Present flexible-load models as a separate scenario with grid effect.
Monthly newsletter · free
Keep your reading list current
Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.
SoSo CAD
Compare the cost of design decisions
Evaluate equipment costs, energy expenses and total cost of ownership (TCO) using your inputs and assumptions in SoSo CAD.
Request a demo
Who should read it
Decision makers and sustainability teams doing energy strategy and capacity planning.
Related standards
- ISO/IEC 30134-2
- ISO/IEC 21836 (SEEM)
Publication details
- Authors
- Jim Simonelli; Victor Avelar; Wendy Torell
- Publisher
- Schneider Electric
- Year
- 2025
- Document number
- WP 212
- Document language
- English
- Source type
- Manufacturer
- Access
- Free to read
- Licence
- Copyright retained; citation only — the publisher’s terms apply to the original document
Citation
Jim Simonelli; Victor Avelar; Wendy Torell (2025). Bending the Energy Curve: Decoupling Digitalization Trends from Data Center Energy Growth. Schneider Electric. WP 212. https://download.schneider-electric.com/files?p_Doc_Ref=SPD_WP212_EN