Plan Nacional de Data Centers 2024-2030
Original title Plan Nacional de Data Centers 2024–2030
Ministerio de Ciencia, Tecnología, Conocimiento e Innovación, Chile
Chile's National Data Centre Plan (PDATA) 2024-2030, from the Ministry of Science, sets eight measures for an industry at 198 MW installed: a permit guide, SEIA environmental criteria, clean production agreements and AI campuses.
On this page
Overview
PDATA is Chile's 2024-2030 plan to organise the industry's growth, led by the Ministry of Science, Technology, Knowledge and Innovation with several ministries, the National Electric Coordinator, the Environmental Assessment Service (SEA), InvestChile and the Sustainability Agency. It aims to make Chile a regional data-centre hub without lowering environmental standards, to spread growth to regions with renewable energy and to ensure responsible water management.
The plan sketches the sector in numbers: capacity under 35 MW in 2013 rose to 82.3 MW five years later and now stands at 198 MW (almost 5 times in ten years). Thirty new projects are identified to 2028: 14 early-stage (US$1,217 million) and 16 in execution (US$2,931 million). Global average PUE was about 1.55 in 2023, evaporative cooling averages a WUE of 1.8 L/kWh, and some Chilean centres reach 0.2 L/kWh.
The main measures are: permit and criteria guides (a digital guide to critical permits, standard environmental criteria in SEIA), a digital tool for balanced growth, Clean Production Agreements (APL), a shared state multi-cloud service, skills development, AI campuses, AI compute capacity for R&D and a multi-stakeholder monitoring committee. Each measure has 2025-2027 and 2028-2030 stages, a goal and an indicator.
The plan is a policy document, not an engineering specification. Its value for designers is in showing how water and energy efficiency expectations (free cooling, closed-loop liquid cooling, adiabatic and immersion cooling) will develop and how the permit process will be standardised.
Key points
- Chilean data-centre capacity rose from under 35 MW in 2013 to 82.3 MW in 2018 and 198 MW today (almost 5 times in ten years).
- Thirty new projects to 2028: 14 early-stage (US$1,217 million) and 16 in execution (US$2,931 million).
- Global average PUE in 2023 was about 1.55; the industry aims to approach 1.0.
- Constant evaporative cooling averages a WUE of 1.8 L/kWh; daily water use of a large centre can be 1-3 million litres; some Chilean centres reach 0.2 L/kWh.
- Water-efficient alternatives include free cooling, closed-loop liquid cooling, adiabatic cooling, immersion cooling and AI-assisted cooling optimisation.
- Data centres account for about 2% of global electricity use, with annual growth rates of 20-40%.
- The plan commits to publishing standard environmental assessment criteria for data centres within SEIA (indicator: guide published on a website) and a digital guide to critical permits.
- Clean Production Agreements between the state and industry will improve water, energy and carbon-footprint performance.
- Among the eight measures are AI campuses and AI compute capacity for R&D.
Using it in design
- For Chilean projects, assess the cooling concept on WUE and compare free cooling, adiabatic or closed-loop liquid cooling against evaporative systems first.
- State PUE and WUE targets and the water-use calculation clearly in the environmental assessment file; the plan's standard SEIA criteria will shape this expectation.
- In site selection assess renewable energy access and the regional distribution goal (regions outside Santiago).
- Align the permit schedule with the critical-permit guide and build community relations early.
Who should read it
Data-centre developers and designers investing in Chile, policy analysts and sustainability consultants.
Document contents
- Executive summary
- Introduction: data-driven economy, challenges, Chile as a destination, origin of the plan
- Plan objectives
- Measures
- Digital tool
- Critical permits guide
- Environmental assessment criteria
- Clean Production Agreements
- State shared multi-cloud service
- Skills development
- AI campuses
- AI compute capacity
- Multi-stakeholder committee
- Conclusion
Publication details
- Authors
- Ministerio de Ciencia, Tecnología, Conocimiento e Innovación, Chile
- Publisher
- Ministerio de Ciencia, Tecnología, Conocimiento e Innovación, Chile
- Year
- 2024
- Document language
- Spanish
- Source type
- Government / public
- Access
- Free to read
- Licence
- Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note
Official publisher document inspected. No document-specific commercial redistribution permission established; retain metadata and original short summaries only.
Citation
Ministerio de Ciencia, Tecnología, Conocimiento e Innovación, Chile (2024). Plan Nacional de Data Centers 2024–2030. Ministerio de Ciencia, Tecnología, Conocimiento e Innovación, Chile. https://minciencia.gob.cl/uploads/filer_public/95/6b/956b8c9f-d937-4b4d-8f6c-a871495a52ff/plan_nacional_de_data_centers_pdata.pdf
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.