AIDC机房参考设计白皮书 (AIDC Machine Room Reference Design White Paper)
Huawei Digital Power
A Chinese-language Huawei Digital Power white paper on how to plan AI data-centre (AIDC) halls for rapidly rising rack power across cooling, power distribution, structure and cabling, and how to deliver them quickly.
On this page
Overview
The white paper says AI workloads are developing toward densification, liquid cooling and clustering. A rack power forecast is given in a table: about 50 kW in 2025, 80-150 kW in 2026, 150-300 kW in 2027 and above 300 kW in 2028. A single super-node will need 1-10 MW and a single cluster hundreds of MW; hall power of 1-2 MW today must move to 10-20 MW and a 10 MW-class building to the 100 MW class.
Challenges are treated under four headings. In cooling, as rack power goes from 50 kW to 300 kW the liquid share rises from 70% to over 90%, the air-cooled part rises from 10 kW to about 20 kW, and secondary-side flow and flow resistance grow non-linearly. In power distribution, today's interfaces are mainly 32 A/3P and 63 A/1P; a 300 kW rack on 2N needs 18 feeds of 63 A/3P. In structure, a typical AI rack weighs about 1.3 t and needs about 12 kN/m², and a 300 kW rack is expected to exceed 2 t and need 20 kN/m². In cabling, network cable count is about ten times that of a conventional hall.
Design recommendations: in cooling, one cooling source for both air and liquid (flexibility across air/liquid ratios), CDU capacity and secondary main-pipe diameter sized for the highest density, and double-sided room-level air conditioning or near-end air conditioning for air cooling. In power, pooling MV and LV distribution to the maximum capacity and decoupling it from IT equipment, flexible rack feeds with intelligent busway and swappable tap-off boxes, and batteries kept away from IT equipment in separate fire-rated, ventilated rooms. In structure, at least 20 kN/m² loading and about 7 m clear height for 300 kW racks.
On delivery time, the paper states that the current 'civil first, then mechanical and electrical' model takes 6-8 months for a liquid-cooled hall, that customers have asked for a 4-month readiness period (a few even 2 months). Two models are proposed: bringing the large mechanical and electrical works forward (readiness falls to about 3 months), and turning large and small M&E into standardised, modular, prefabricated products. The paper closes with a call for industry standards and an ecosystem, and gives recommendations for existing halls.
Key points
- Rack power forecast: ~50 kW (2025), 80-150 kW (2026), 150-300 kW (2027), above 300 kW (2028).
- Super-node power heading to 1-10 MW and clusters to hundreds of MW; halls from 1-2 MW to 10-20 MW and buildings from 10 MW to the 100 MW class.
- As rack power goes from 50 kW to 300 kW the liquid cooling share rises from 70% to 90%; the air-cooled part from 10 kW to ~20 kW.
- With today's 32 A/3P and 63 A/1P interfaces, a 300 kW rack on 2N needs 18 feeds of 63 A/3P; the answer is higher-capacity feeds or intelligent busway with swappable tap-off boxes.
- Batteries should be located away from IT equipment in separate fire-rated, ventilated rooms to isolate thermal-runaway risk.
- Floor loading: ~12 kN/m² for a ~1.3 t rack today; at least 20 kN/m² recommended for new liquid-cooled halls.
- For a 300 kW rack, water-electricity-network space at micro-module level is ~5 m; with ~1 m for services and ~1 m for beams the room height is ~7 m.
- Network cable count is about ten times a conventional hall; double-layer mesh trays above racks are recommended.
- A liquid-cooled hall takes 6-8 months in the current model; bringing large M&E forward can cut readiness to about 3 months.
Using it in design
- For a new AI hall, base the rack power roadmap (2026: 80-150 kW, 2027: 150-300 kW) on CDU capacity and secondary pipe diameter that can flex up to 300 kW.
- Run the per-rack 2N feed count: for 300 kW, evaluate busway with swappable tap-off boxes against 18 x 63 A/3P feeds.
- Design floor loading to at least 20 kN/m² and clear height to about 7 m; the paper states the structural cost increase stays below 1% of CapEx.
- Plan battery rooms as fire-compartmented, ventilated and separate from the IT hall.
- Pool MV and LV distribution to the maximum capacity and design it separately from IT equipment so mechanical works can start before IT equipment is fixed.
- Plan overhead trays and network routing for the largest cluster, dual-route and double-layer.
Who should read it
Electrical, mechanical and structural designers and project managers planning AI and high-density data-centre halls.
Document contents
- AI workload and compute equipment trends
- AIDC hall challenges: cooling, power distribution, structure, network cabling, construction time
- Design approach recommendations
- Deployment model recommendations
- Recommendations for existing halls
- Standards and ecosystem initiative
Related standards
- GB 50174
Publication details
- Authors
- Huawei Digital Power
- Publisher
- Huawei Digital Power
- Year
- 2025
- Document language
- Chinese
- Source type
- Manufacturer
- Access
- Free to read
- Licence
- Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note
Vendor white paper, free PDF on digitalpower.huawei.com AIDC page; no open licence. Year from PDF metadata (Sep 2025).
Citation
Huawei Digital Power (2025). AIDC机房参考设计白皮书 (AIDC Machine Room Reference Design White Paper). Huawei Digital Power. https://digitalpower.huawei.com/dam/asset/view/5f7739895c4a410aae6b24ad3d8dd360.pdf
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.