State Energy Efficiency Action Plan, Karnataka (BEE and CII)

Original title State Energy Efficiency Action Plan: Karnataka

Bureau of Energy Efficiency / Confederation of Indian Industry

The Karnataka plan, prepared by CII for BEE, sets sector strategies to 2031; its data-centre strategy takes PUE from 2.0 to 1.5 (moderate) or 1.2 (ambitious) for savings of 0.08 to 0.12 MTOE.

On this page

Overview

The document is the Karnataka part of the Bureau of Energy Efficiency's (BEE) State Energy Efficiency Action Plan assignment, with the Confederation of Indian Industry (CII) as technical consultant and Karnataka Renewable Energy Development Limited (KREDL) as partner. The plan has a 5-year short-term strategy and a long-term plan to 2031. It covers industry, transport, buildings, agriculture and fisheries and the municipal sector; data centres are one strategy in the buildings sector and take about three pages of the document.

The data-centre strategy (6.2.5) recommends incentivising efficient data centres to meet the state's target of more than 200 MW of data-centre capacity by 2025: fast-tracked environmental clearance, reduced building taxes and concessional financial assistance. The main scope is data centres in major cities and distributed content delivery networks; the current policy is the Karnataka Data Center Policy 2022-27. Three areas are named for cutting carbon: the electrical system (tuning UPS and transformer loading, harmonic filters, rotary and modular UPS, LED lighting), critical cooling (thermal storage, water cooling, economizers) and IT peripherals (high-density servers, virtualisation, storage utilisation).

The saving potential assumes a business-as-usual PUE of 2.0 for targeted data centres, falling to 1.5 in the moderate and 1.2 in the ambitious scenario. For 2031, energy savings are 0.08 MTOE (moderate) and 0.12 MTOE (ambitious), with greenhouse gas reductions of 0.25 and 0.38 MtCO2. The document states that applying the latest technologies in a standard data centre with an operating PUE of 2.0 typically saves at least 25 to 30%.

The action plan proposes fast-tracked environmental clearance in the short term and, in the long term, a concession in state GST for buying energy-intensive equipment such as chillers, transformers and UPS systems. The document is a policy and planning text; it contains no engineering design method or measurement procedure.

Key points

  1. The plan is Karnataka's state energy efficiency action plan, prepared by CII with KREDL for BEE, with a 5-year short-term strategy and a long-term plan to 2031.
  2. The state has a target of more than 200 MW of data-centre capacity by 2025.
  3. Recommended incentives: fast-tracked environmental clearance, reduced building taxes and concessional financial assistance.
  4. The current policy is the Karnataka Data Center Policy 2022-27.
  5. PUE for targeted data centres is assumed at 2.0 in business as usual, 1.5 in the moderate and 1.2 in the ambitious scenario.
  6. 2031 energy savings are 0.08 MTOE in the moderate and 0.12 MTOE in the ambitious scenario.
  7. Greenhouse gas reduction is 0.25 MtCO2 (moderate) and 0.38 MtCO2 (ambitious).
  8. Applying new technology in a data centre with PUE 2.0 typically saves 25 to 30%.
  9. In the long term, a state GST concession is proposed for buying chillers, transformers and UPS systems.

Using it in design

  • To use a state incentive in India, choose a design PUE target consistent with the moderate (1.5) or ambitious (1.2) scenario.
  • In the electrical system, evaluate UPS and transformer load tuning, harmonic filters and modular or rotary UPS at concept stage.
  • In cooling, compare thermal storage, water cooling and economizers against the processor density.
  • On the IT side, include in the capacity plan how virtualisation and high-density servers reduce cooling and space needs.
  • Account for policy tools such as GST concessions on equipment and fast-tracked environmental clearance in project schedule and cost.

Who should read it

Developers planning data-centre investment in India and consultants and policymakers following state policy and incentives.

Document contents

  1. Introduction (background, India's NDCs, action plan, Karnataka profile, energy scenario, institutional framework)
  2. Identification of focus sectors
  3. Projections and forecasting
  4. Focus sector 1: Industry
  5. Focus sector 2: Transport
  6. Focus sector 3: Buildings (including 6.2.5 Promotion of energy efficient data centers)
  7. Focus sector 4: Agriculture and fisheries
  8. Municipal sector
  9. Financing, ESCO and bulk procurement models

Publication details

Authors
Bureau of Energy Efficiency / Confederation of Indian Industry
Publisher
Bureau of Energy Efficiency / Confederation of Indian Industry
Year
Year not stated
Document language
English
Source type
Government / public
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

Direct official BEE PDF downloaded and extracted. Publication year not stated in inspected front matter; URL timestamp is not used as publication evidence.

Citation

Bureau of Energy Efficiency / Confederation of Indian Industry State Energy Efficiency Action Plan: Karnataka. Bureau of Energy Efficiency / Confederation of Indian Industry. https://beeindia.gov.in/WriteReadData/RTF1984/RTF-PDF-6f2ecce409dd7741_1776076686.pdf

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Cost studies in SoSo CAD

Calculate equipment cost, energy cost and total cost of ownership (TCO) from the design’s quantities and your own price assumptions.

CAPEX and TCO estimates in the SoSo CAD cost workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.