NACo Informational Primer and County Considerations: Data Centers (2026)
Original title NACo Informational Primer and County Considerations: Data Centers
National Association of Counties
The US National Association of Counties' February 2026 primer: a data centre permitting and oversight framework for county governments with 200-500 ft setbacks, 65/55 dB noise limits and approvals sequenced to utility capacity.
On this page
Overview
The document is the National Association of Counties' (NACo) seven-page primer dated February 2026. It states that AI-ready data centre capacity is expected to grow about 33% annually from 2025 to 2030 and gives county elected officials, administrators and planning leaders a high-level framework to evaluate, permit and oversee data centre development. It focuses on key challenges across the project lifecycle rather than technical detail.
The primer explains that county authority varies by state (six profiles from Dillon's Rule to Home Rule) and is exercised through zoning, special use permits, site plan review and development agreements. Expected impacts include high capital investment and tax revenue, few but high-quality permanent jobs, ongoing tax-base growth from equipment reinvestment, and significant power demand and infrastructure upgrade needs. Best practices are alignment with county goals, confirming the timing of power, water, wastewater and transportation capacity before approval, enforceable conditions and transparent communication.
The zoning section stresses that data centres may look like office buildings but their operations and infrastructure needs resemble a factory. Typical setbacks from property lines range from 200 ft to 500 ft from a residential district. Noise limits are often 65 dB at the property line and 55 dB in quieter or residential areas; A and C-weighted testing and limits on generator test hours to daytime have appeared. Architectural requirements include height and depth variation to break up building mass, real or faux windows and doors, and non-reflective materials.
The power section states that data centres consumed nearly 4.4% of US annual electricity in 2023 and that national energy demand is estimated to rise 20% by 2030, which can require additional generation and grid infrastructure. Water use ranges from minimal to substantial depending on design and local conditions; water balance studies, discharge water quality standards and long-term monitoring with curtailment triggers are suggested. The checklist covers infrastructure capacity, governance and land use. The document is for local government readiness, not detailed facility design.
Key points
- AI-ready data centre capacity is expected to grow about 33% annually from 2025 to 2030.
- Data centres used nearly 4.4% of US annual electricity in 2023; national energy demand is estimated to rise 20% by 2030.
- Typical setbacks from property lines are 200-500 ft from a residential district; more in smart-growth areas.
- Noise limits are often 65 dB at the property line and 55 dB in quieter or residential areas; A and C-weighted testing and generator test hour limits.
- Water balance studies, discharge water quality standards and long-term monitoring with curtailment triggers are suggested.
- Approvals should be sequenced to confirmed utility capacity, and responsibility for infrastructure upgrades defined.
- Development or community benefit agreements are tools for infrastructure, workforce and repowering, reuse or decommissioning provisions.
- County authority ranges across six profiles from Dillon's Rule to Home Rule (7, 17, 4, 5, 6 and 9 states from most restrictive to most flexible).
Using it in design
- In siting and layout assume 200-500 ft setbacks and 65/55 dB noise limits; compute chiller and generator sound power against these limits and add screens, berms or sound-absorbing structures to the plan.
- Limit the generator test schedule to daytime hours and include A and C-weighted measurement requirements in acoustic design scope.
- Attach a water balance study and discharge quality to the permit application; prepare a curtailment plan for drought or restriction triggers.
- Clarify in writing with the county and utility who is responsible for power and substation upgrades and their timing; sequence approvals with confirmed capacity.
- Bring repowering, reuse and decommissioning provisions (batteries, fuel systems, specialist infrastructure) into design and agreements from the start.
Who should read it
County and local government officials, planning commissions and developers running local data centre permitting processes in the US.
Document contents
- Introduction
- Data Centers
- What to Expect from Data Center Development
- County Considerations
- Local Land Use and Zoning Authorities
- Setbacks, Architecture and Noise
- Power
- Water
- Development Agreements
- County Considerations Checklist
Publication details
- Authors
- National Association of Counties
- Publisher
- National Association of Counties
- Year
- 2026
- Document language
- English
- Source type
- Industry body
- Access
- Free to read
- Licence
- Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note
PDF inspected; February 2026 is printed on final page. No full-document commercial reuse licence verified.
Citation
National Association of Counties (2026). NACo Informational Primer and County Considerations: Data Centers. National Association of Counties. https://www.naco.org/sites/default/files/2026-02/2026%20Data%20Center%20Primer.pdf
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.