TH Series Domestic Water Booster Sets: Operation and Maintenance Manual

Original title TH Serisi Kullanım Suyu Hidroforları: İşletme ve Bakım Kılavuzu

Standart Pompa

Standart Pompa's October 2021 (Revision 1) TH series booster manual, covering a 2-500 m³/h flow range, installation, a commissioning checklist and periodic maintenance at least every 3 months.

On this page

Overview

The manual contains safety, transport, installation, commissioning, operation, maintenance and troubleshooting information for TH series domestic water booster sets used in housing estates, hotels, schools, hospitals, industrial plants and fire systems. Operating ranges by pump type: CDLF 3-255 m³/h, 30-160 mSS, -10 to 70 °C, 10-16-25 bar; SBT and SBM 2-12 m³/h, 25-100 mSS, 0-60 °C, 10 bar; SBT-V and SBM-V 2-45 m³/h, 25-120 mSS; GRV-VD 6-30 m³/h; GRV-VB 8-45 m³/h, 30-160 mSS; SKM-V 12-500 m³/h, 180 mSS, 0-110 °C. The service life declared by the ministry for the product is ten years.

The installation section requires on-site installation per EN 349, a booster room that is free of frost and explosion risk, closed, dry, ventilated and well lit, and protection against flooding. The suction pipe should be as short as possible without elbows, the set placed next to the reserve tank with the suction collector not above the tank bottom. The strainer is fitted at the tank filling port, pipe and accessory diameters must not be smaller than the collector, and the piping must not load the collector.

Commissioning is performed only by the authorised service and the warranty starts with it. The checklist includes measuring earthing, filling and venting the suction line, keeping the discharge valve closed, checking motor rotation in HAND, setting pre-charge pressure and pressure switch, checking sequential operation in multi-pump sets, and venting again 5-10 minutes after start. Sets not serviced by the authorised service at least every 3 months may lose warranty fully or partly; grease-nipple pumps are lubricated after 2000 hours; the shaft of an idle pump is turned every three months.

The manual also covers check valve and expansion tank diaphragm replacement, the pressure switch setting table, a fault diagnosis table and, in the annexes, general assembly drawings, spare parts lists, tightening torques, maximum forces on the collector and estimated noise levels.

Key points

  1. Applications: housing estates, hotels, schools, hospitals, industrial plants and fire systems.
  2. CDLF booster sets cover 3-255 m³/h, 30-160 mSS, -10 to 70 °C, 10-16-25 bar.
  3. SKM-V booster sets cover 12-500 m³/h, 180 mSS, 0 to 110 °C.
  4. On-site installation per EN 349; the room must be frost-free, ventilated and protected against flooding.
  5. Suction pipe short and without elbows; strainer at the tank filling port, not between suction collector and tank.
  6. Commissioning by authorised service; earthing measurement, suction line venting and motor rotation are checked.
  7. The pump is vented again 5-10 minutes after starting.
  8. Sets not serviced by authorised service at least every 3 months may lose warranty fully or partly.
  9. Grease-nipple pumps are lubricated after 2000 hours; the shaft of an idle pump is turned every three months.

Using it in design

  • When selecting a service or fire water booster, verify the pump type's flow, head, temperature and maximum working pressure range against demand.
  • Design the booster room for frost, ventilation, lighting and flood protection, with maintenance and pump lifting clearances.
  • Lay out the reserve tank and suction collector with short, elbow-free suction and position the collector relative to the tank bottom.
  • Support piping close to the collector so it does not load it, and connect the discharge with a compensator and valve.
  • Add the commissioning checklist (earthing, venting, rotation, pre-charge, pressure switch) to the commissioning specification and the 3-month service contract to the O&M plan.

Who should read it

Mechanical engineers and technicians designing, commissioning and operating service water and fire water booster systems in data centres and buildings.

Document contents

  1. General Instructions
  2. Safety and Environment
  3. Information About Booster Sets
  4. Transport and Storage
  5. Installation
  6. Commissioning
  7. Operation
  8. Maintenance
  9. Faults, Causes and Remedies
  10. Annexes: General Assembly Drawings, Spare Parts List, Tightening Torques, Estimated Noise Levels

Publication details

Authors
Standart Pompa
Publisher
Standart Pompa
Year
2021
Document number
10.2021, Revizyon 1
Document language
Turkish
Source type
Manufacturer
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

Public source opened on the access date. No open redistribution licence established; metadata and original short summaries only.

Citation

Standart Pompa (2021). TH Serisi Kullanım Suyu Hidroforları: İşletme ve Bakım Kılavuzu. Standart Pompa. 10.2021, Revizyon 1. https://product.standartpompa.com/AppRepo/Document/20220128121512-6626.pdf

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Cooling capacity in SoSo CAD

Check zone heat loads, installed capacity and the capacity left with the largest unit out, as part of the design.

Zone heat loads and capacity balance in the SoSo CAD cooling workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.