Technical guideFree to read2026

Mythbuster: 10 myths about AI data centers and water - and what the numbers actually say

Submer

A 2026 Submer white paper re-examining 10 common claims about AI data-centre water with sources, using 17 billion gallons direct and about 211 billion gallons indirect US consumption in 2023.

On this page

Overview

The document is an assessment prepared by an immersion cooling vendor and gives, for each myth, sources, numerical context and a caveat. The first myth traces the 'bottle of water per ChatGPT conversation' claim to one academic estimate of roughly 500 ml per 10 to 50 GPT-3 responses, later revised to about 15 ml in total, and notes Google's August 2025 report of 0.26 ml on-site water for the median Gemini prompt. The three figures use different boundaries.

The cooling architecture section separates evaporative towers, chillers (which consume no water in standard form) and dry coolers (no water or refrigeration). Closed loops are filled once at commissioning and recirculate the same water. In Google's 2024 facility disclosures, one Texas facility used about 10,000 gallons a year while the largest consumer in Iowa used about 1 billion. The withdrawal, discharge and consumption distinction is explained: Equinix withdrew 1.4 billion gallons globally in 2024 and consumed 1.2 billion.

The scale and indirect water sections cite the 2024 LBNL report: US data centres consumed about 17 billion gallons directly in 2023 and about 211 billion gallons indirectly through electricity generation, so over 90% of the footprint never appears in facility meters, though that estimate may overstate indirect use by a factor of two or more. Direct consumption is about 0.3% of US public water supply. Intensity is improving (Microsoft fleet WUE from 0.49 to 0.30 L/kWh in 2021-2024) but sector totals may rise two to four times by 2028.

Final sections cover community cases (Middenmeer in the Netherlands, 84 million litres of drinking water in 2021 against a projected 12-20 million), solutions (zero-evaporation designs, reclaimed water, WUE in permits, 2030 water-positive commitments), mandatory annual reporting above 500 kW under the EU Energy Efficiency Directive, and five questions to ask (what, which, where, when, who checks). The conclusion is that the unresolved issue is accounting: facility-level, independently verifiable disclosure.

Key points

  1. The 'bottle per conversation' claim comes from an estimate of 500 ml per 10-50 GPT-3 responses; the revised estimate is about 15 ml total and Google reported 0.26 ml on-site for the median Gemini prompt.
  2. Google 2024 disclosures: one Texas facility about 10,000 gallons/year, the largest Iowa consumer about 1 billion gallons/year.
  3. Equinix withdrew 1.4 billion gallons globally in 2024 and consumed 1.2 billion.
  4. US data centres consumed about 17 billion gallons directly and about 211 billion indirectly in 2023; over 90% of the footprint is not in facility meters.
  5. Direct data-centre consumption is about 0.3% of US public water supply.
  6. Microsoft fleet WUE fell from 0.49 to 0.30 L/kWh in 2021-2024; sector totals are expected to be 2-4 times higher by 2028.
  7. Middenmeer consumed 84 million litres of drinking water in 2021 against a projection of 12-20 million.
  8. In the EU, data centres above 500 kW of IT power must report annual KPIs including WUE.
  9. What is missing is facility-level, independently verifiable disclosure of withdrawal, discharge and consumption.

Using it in design

  • When quoting water figures, state withdrawal, discharge and consumption separately and which one is cited.
  • Compare cooling architectures (evaporative, chiller, dry cooler, hybrid) on the water-energy balance; closed-loop systems need fill water only at commissioning and maintenance.
  • To account for indirect water, review the water intensity of the regional grid mix.
  • In files for customers and utilities, state cooling method, water type (potable or reclaimed), location and time resolution.
  • Write WUE into permits and contracts as a facility-level, verifiable metric.

Who should read it

Engineers, operators and municipal decision makers preparing data-centre water strategy and public communication.

Document contents

  1. Introduction
  2. Myth 1: Every ChatGPT conversation drinks a bottle of water
  3. Myth 2: All data centers cool with water
  4. Myth 3: Water used by a data center is gone forever
  5. Myth 4: AI's water footprint is mostly at the data center
  6. Myth 5: Any water use is bad water use
  7. Myth 6: Data centers are uniquely enormous water users
  8. Myth 7: More compute always means more water
  9. Myth 8: Data centers take drinking water from communities
  10. Myth 9: Water use is just the cost of progress, and nothing can be done
  11. Myth 10: The numbers can be taken at face value
  12. The real questions to ask
  13. Sources and boundaries

Related standards

  • EU Delegated Regulation (EU) 2024/1364
  • ISO/IEC 30134-9 (WUE)

Publication details

Authors
Submer
Publisher
Submer
Year
2026
Document language
English
Source type
Manufacturer
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

Vendor publication on submer.com; no open licence stated

Citation

Submer (2026). Mythbuster: 10 myths about AI data centers and water - and what the numbers actually say. Submer. https://submer.com/wp-content/uploads/2026/08/Submer-Group_Myths_Myths_AI_Data_Centers_Water.pdf

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Cooling capacity in SoSo CAD

Check zone heat loads, installed capacity and the capacity left with the largest unit out, as part of the design.

Zone heat loads and capacity balance in the SoSo CAD cooling workspace