Highly Renewable District Heat for Espoo Utilizing Waste Heat Sources
Energies (MDPI AG) · Pauli Hiltunen, Sanna Syri
Aalto University researchers modelled the Espoo (Finland) district heating system run by Fortum to find how much heat-pump-upgraded waste heat from a large data centre is needed to reach 95% renewable DH production.
CC BY 4.0 — share with attribution
On this page
Overview
The district heating operator Fortum and the city of Espoo have set a goal to abandon coal and raise the renewable share to 95% by 2029, and Fortum is considering using waste heat from a large data centre. The study investigates feasibility and the required amount of waste heat. Two operation strategies are introduced, one based on marginal costs and one prioritising waste heat utilisation, each modelled with three electricity price scenarios. Because low-temperature waste heat from a data centre must be primed by heat pumps, electricity price significantly affects feasibility.
The Espoo DH network serves over 80% of the population in Espoo and neighbouring cities, with total annual heat demand of about 2.6 TWh. Waste-heat sources already connected include Espoo hospital (1.5 MW) and an Ericsson data centre (2.8 MW), and a 100 MW data centre was planned. Heat-recovery heat-pump COP depends on the data-centre cooling system: all-liquid cooling recovers heat at 50-60 °C with COP up to 6.3, mixed air-liquid reaches COP 5.5 and air-cooled systems reach 4.1.
In the highest electricity price scenario, 200 MW of data-centre heat-pump capacity is needed to reach 95% renewables under marginal-cost dispatch, versus 150 MW if waste heat is prioritised. The investment analysis assumed a 20-year heat-pump lifetime; the investment is feasible in the two lower electricity price scenarios, but NPV is negative over that lifetime at the highest price. Data-centre waste heat suits base load and fits poorly as a replacement for peak heat-only boilers, and the capacity needed for 95% renewables already exceeds summer minimum demand.
Prioritising waste heat leads to higher production costs but needs less capacity, and high electricity prices undermine heat-pump economics. Liquid cooling and low-temperature DH would improve utilisation of waste heat. Limits: the modelling is for a single city and operating system, so results depend on the Espoo network and Fortum assets.
Key points
- The Espoo DH network serves over 80% of the population in Espoo and neighbouring cities, with total annual heat demand of about 2.6 TWh.
- Waste-heat sources already connected include Espoo hospital (1.5 MW) and an Ericsson data centre (2.8 MW); a 100 MW data centre was planned in Espoo.
- Heat-recovery heat-pump COP depends on the cooling system: all-liquid cooling recovers heat at 50-60 °C with COP up to 6.3, mixed air-liquid COP 5.5, air-cooled 4.1.
- In the highest electricity price scenario, 200 MW of data-centre heat-pump capacity is needed to reach 95% renewables under marginal-cost dispatch, versus 150 MW if waste heat is prioritised.
- The investment analysis assumed a 20-year heat-pump lifetime; it is feasible in the two lower electricity price scenarios, but NPV is negative at the highest price.
- Data-centre waste heat suits base load and fits poorly as a replacement for peak heat-only boilers; the capacity needed for 95% renewables already exceeds summer minimum demand.
Using it in design
- In selling data-centre waste heat, set heat-pump COP by cooling type (all-liquid 6.3, mixed 5.5, air-cooled 4.1) and include electricity price sensitivity in the feasibility study.
- Check waste-heat capacity against summer minimum demand; if the required capacity exceeds it, use is limited and it cannot replace peak boilers.
- Evaluate liquid cooling (recovery at 50-60 °C) and low-temperature district heating as design options that improve waste-heat use.
Monthly newsletter · free
Keep your reading list current
Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.
SoSo CAD
Compare the cost of design decisions
Evaluate equipment costs, energy expenses and total cost of ownership (TCO) using your inputs and assumptions in SoSo CAD.
Request a demo
Who should read it
Operators, planners and data-centre designers planning to integrate data-centre waste heat into district heating systems.
Document contents
- 1. Introduction
- 2. Materials and Methods (2.1 External factors, 2.2 Heat Pumps, 2.3 Buy-In Heat, 2.4 Assumptions, 2.5 Investment Analysis)
- 3. Results (marginal-cost strategy, 3.2 Operation Strategy Prioritizing Waste Heat, 3.3 Fuel Consumption, 3.4 Investment Analysis)
- 4. Discussion (4.1 The Goal of 95% of Renewable Production Can Be Achieved, 4.3 Waste Heat Cannot Replace Winter Peak Production in Espoo, 4.5 Liquid Cooling and LTDH Would Improve Utilization of Waste Heat, 4.6 Employment Shifts to IT Sector)
- 5. Conclusions
Read the document
espoo-district-heat-waste-heat-2020.pdf
CC BY 4.0 — share with attribution
The document is provided unaltered because its licence permits redistribution.
Publication details
- Authors
- Pauli Hiltunen; Sanna Syri
- Publisher
- Energies (MDPI AG)
- Year
- 2020
- Volume
- 13
- Issue
- 14
- Pages
- 3551
- Document language
- English
- Source type
- Scientific
- Access
- Open licence — downloadable
- Licence
- CC BY 4.0 — share with attribution
- Licence evidence
- www.mdpi.com
Original licence note
PDF p.1 states the article is open access under the Creative Commons Attribution (CC BY 4.0) licence; MDPI publishes all articles under CC BY 4.0.
Citation
Pauli Hiltunen; Sanna Syri (2020). Highly Renewable District Heat for Espoo Utilizing Waste Heat Sources. Energies (MDPI AG). 13(14), 3551. https://doi.org/10.3390/en13143551
Events on this subject
- iMasons Climate Accord Summit
- ICCI 2027 – Uluslararası Enerji ve Çevre Fuarı ve Konferansı
- The smarter E Europe (Intersolar Europe, ees Europe, Power2Drive, EM-Power)
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.