Overview

The paper opens with density categories: citing AFCOM DCISE-001 (2014), many racks run 2-4 kW, medium density is 5-9 kW and 10-25 kW is no longer unusual. It then applies the 80 % rule: a rack needing 20 A at 208 V requires a 30 A circuit (80 % rule = 24 A), about 5 kVA. The example shows how the rule inflates circuit sizing at rack level.

The author's most concrete argument concerns A/B feeds. A 7 A + 7 A snapshot looks safe, but peaks push the sum above the 16 A threshold (80 % of 20 A), and losing one feed would leave about 18 A on the survivor. Modern servers may idle at 20-25 % of maximum power, so peak current can be 4-5 times idle. Planning on average values is therefore misleading.

On cost, decommissioning a single 1U server is said to save about USD 500 a year in energy, USD 500 in OS licence and USD 1,500 in hardware maintenance. Mission-critical power and cooling is cited at USD 12,500 (Tier II) to USD 25,000 (Tier IV) per kW, i.e. USD 125k-250k for a 10 kW rack. ASHRAE A3/A4 classes allow 40 C and 45 C inlets and hot-aisle exhaust may reach 50 C, so PDUs rated to 60 C are emerging. The paper is sponsored, so its strategic framing of the PDU favours the vendor.

Key points

  1. Densities: many racks 2-4 kW, medium 5-9 kW, 10-25 kW no longer unusual (AFCOM DCISE-001, 2014).
  2. A rack needing 20 A at 208 V requires a 30 A circuit (80 % rule = 24 A), about 5 kVA.
  3. A/B example: 7 A + 7 A snapshot looks safe, but peaks exceed the 16 A threshold (80 % of 20 A) and one feed lost leaves about 18 A on the survivor.
  4. Modern servers may idle at 20-25 % of max power, so peak current can be 4-5x idle.
  5. Decommissioning one 1U server saves about USD 500/yr energy, USD 500 OS licence and USD 1,500 hardware maintenance.
  6. ASHRAE A3/A4 inlets of 40 C and 45 C; exhaust may reach 50 C, so 60 C-rated PDUs are emerging.
  7. Mission-critical power and cooling cost cited at USD 12,500 (Tier II) to 25,000 (Tier IV) per kW; USD 125k-250k for a 10 kW rack.

Using it in design

  • For A/B rack feeds, check that the sum of both feeds' peak load stays below 80 % of one branch breaker (failover check) and warn when only average load is entered.
  • Keep a PDU temperature rating in the catalogue and warn if hot-aisle or rear-mounted PDUs are rated below the design exhaust temperature.
  • Offer rack density presets based on the DCISE-001 categories.

Monthly newsletter · free

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.

SoSo CAD

Review your power design in SoSo CAD

Inspect supply paths, equipment loads and UPS failure scenarios in one model.

Request a demo
Single-line diagram in the SoSo CAD power and capacity workspace

Who should read it

Electrical designers evaluating A/B rack circuits and PDU temperature ratings, and colocation operators.

Related standards

  • NEC 80 % continuous load rule
  • The Green Grid PUE
  • ASHRAE TC 9.9 (2011/2012)
  • AFCOM DCISE-001

Publication details

Authors
Julius Neudorfer
Publisher
Legrand
Year
2015
Document language
English
Source type
Manufacturer
Access
Free to read
Licence
Copyright retained; citation only — the publisher’s terms apply to the original document

Citation

Julius Neudorfer (2015). Rack Power Distribution: Just the End of the Power Chain, or Key Strategic Advantage? (Mission Critical Rack Power Distribution Whitepaper). Legrand. https://cdn10.servertech.com/assets/documents/documents/57/original/WP-Mission_Critical_Rack_Power_Distribution_Whitepaper_Oct_2019.pdf

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.