Technical guideCitation2026

Data Centre Construction Cost Index 2026-27

Turner & Townsend · Paul Barry, Turner & Townsend

Turner & Townsend's tenth annual index (October 2026) gives indicative construction cost per watt for 62 markets; US AI-ready facilities cost about 10% more than traditional builds.

On this page

Overview

Turner & Townsend's Data Centre Construction Cost Index 2026-27 is the tenth annual edition of the series, published in October 2026. Drawing on more than 500 projects, it gives indicative construction cost per watt for 62 markets, 12 of them new, and includes a survey of 401 industry leaders.

At the top of the cost ranking are Tokyo (US$18.28/W), Osaka (17.15), Zurich (15.93), Singapore (15.39) and Silicon Valley (15.01). The lowest are Shanghai (5.79), Mumbai (6.83), Ho Chi Minh City (8.32), Bogota (9.13) and the UAE (9.20). The spread shows how many times more the same capacity can cost to build in different markets. The AI effect is a separate finding: US AI-ready facilities cost about 10% more, and advanced AI builds run at US$14-16/W against a country average of US$12.08/W. The report points to density and liquid cooling as the reasons for the difference.

Survey results reveal constraints: 81% of respondents report constrained skilled labour, with mechanical, electrical and plumbing (MEP) trades the most sought after. 56% cite power as a major obstacle, and 52% say utility connections take 1-2 years while 32% say over 2 years. Limits: the values are indicative and vary with project specifics, and the full report was not seen. For designers and investors its value is in anchoring cost and schedule assumptions in pre-feasibility to a published benchmark.

Key points

  1. 62 markets (12 new); more than 500 projects; 401 survey respondents.
  2. Highest $/W: Tokyo 18.28, Osaka 17.15, Zurich 15.93, Singapore 15.39, Silicon Valley 15.01.
  3. Lowest $/W: Shanghai 5.79, Mumbai 6.83, Ho Chi Minh City 8.32, Bogota 9.13, UAE 9.20.
  4. US AI-ready facilities are about 10% costlier; advanced AI builds US$14-16/W against US$12.08/W country average.
  5. 81% report constrained skilled labour; MEP trades are most sought after.
  6. 56% cite power as a major obstacle; 52% say utility connections take 1-2 years and 32% over 2 years.

Using it in design

  • In the cost module, provide a country and city $/W construction rate table and state the edition year.
  • Add an AI and liquid-cooling premium factor (about 10% in the US).
  • In the schedule module, default utility connection time to 1-2 years or more.
  • Mark index values as indicative and verify with project-specific quotation data.

Monthly newsletter · free

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.

SoSo CAD

Check cooling capacity alongside your design

Review zone heat loads, available capacity and the capacity balance after the largest unit is lost in SoSo CAD.

Request a demo
Zone heat loads and capacity balance in the SoSo CAD cooling workspace

Who should read it

Investors, project managers and cost consultants preparing data centre feasibility studies.

Publication details

Authors
Paul Barry; Turner & Townsend
Publisher
Turner & Townsend
Year
2026
Document language
English
Source type
Expert / community
Access
Citation only
Licence
Copyright retained; citation only — the publisher’s terms apply to the original document
Original licence note

Landing page and press release public; full report gated; cited only.

Citation

Paul Barry; Turner & Townsend (2026). Data Centre Construction Cost Index 2026-27. Turner & Townsend. https://www.turnerandtownsend.com/insights/data-centre-construction-cost-index-2026-27/

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.