Uptime Institute Intelligence's Briefing Report 114 summarizes the state of data center waste heat recovery and the drivers for the next few years. The recast EU Energy Efficiency Directive makes this a required assessment for sites of 1 MW and above.

On this page

Overview

The report was published as UII Briefing Report 114 in October 2023 and covers the current state of waste heat recovery in data centers and the drivers for the next few years. Its author is M. Smolaks.

According to the public information, Northern Europe leads with nearly 60 documented heat recovery projects. Citing the Open Compute Project, the introduction mentions around 60 projects in Europe and six in North America, with 11 more in development. The figures suggest that heat reuse is concentrated in particular regions rather than being a widespread practice.

The most important regulatory element is the recast EU Energy Efficiency Directive (EED): data centers with total energy consumption of 1 MW and above must use waste heat recovery or show that it is infeasible. The introduction also states that as much as 90% of the energy used by IT can be recovered as heat.

As a technical caution, cooling often consumes 20% to 30% of total data center power, and heat rejection capacity is still needed as backup even when heat is exported. Heat reuse therefore does not remove the cooling design; it adds a dependency and a further redundancy consideration.

Key points

  1. Northern Europe leads with nearly 60 documented heat recovery projects.
  2. The EU EED recast requires data centers with total energy consumption of 1 MW and above to use waste heat recovery or show infeasibility.
  3. Published as UII Briefing Report 114, October 2023.
  4. As much as 90% of the energy used by IT can be recovered as heat.
  5. Around 60 projects in Europe and six in North America, with 11 more in development (per Open Compute Project).
  6. Cooling often consumes 20% to 30% of total data center power.
  7. Heat rejection capacity is still needed as backup when heat is exported.

Using it in design

  • For EU sites of 1 MW and above, trigger the EED waste-heat assessment as a step in the design process.
  • In a heat-reuse calculator, treat recoverable heat within the bound of up to 90% of IT energy.
  • Keep backup heat rejection capacity in the cooling design even when heat is exported.
  • Use cooling's 20-30% share of total power as an input to recovery feasibility.

Monthly newsletter · free

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.

SoSo CAD

Compare the cost of design decisions

Evaluate equipment costs, energy expenses and total cost of ownership (TCO) using your inputs and assumptions in SoSo CAD.

Request a demo
CAPEX and TCO estimates in the SoSo CAD cost workspace

Who should read it

Engineers working on sustainability, energy efficiency and cooling design, and owners of sites subject to EU rules.

Publication details

Authors
M. Smolaks
Publisher
Uptime Institute Intelligence
Year
2023
Document number
UII Briefing Report 114
Document language
English
Source type
Industry body
Access
Citation only
Licence
Copyright retained; citation only — the publisher’s terms apply to the original document
Original licence note

Report behind a registration form (or Uptime Intelligence subscription); copyright Uptime Institute. Facts taken only from the public landing page / press release. Citation only.

Citation

M. Smolaks (2023). Heat Reuse: A Management Primer. Uptime Institute Intelligence. UII Briefing Report 114. https://uptimeinstitute.com/resources/research-and-reports/heat-reuse-a-management-primer

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.