Avoiding Costs from Oversizing Data Center and Network Room Infrastructure
Schneider Electric, 2012, Vendor publication
Schneider Electric WP 37 uses survey data from customer installations to show that power and cooling are built far larger than the IT load they serve, at a lifecycle penalty of roughly 30%.
Vendor publication
2012